Feed two clock paths from the same 125 MHz active oscillator, with one direct and the other going through a replacement buffer. Small advances and delays can both move the AD8302 phase output in the same direction. The detector folds positive and negative differences together near zero degrees. A report calling a replacement earlier or later needs a test point with an established slope and sign.

Split one source into reference and measurement paths

The AD8302 phase reading folds into the range from zero to 180 degrees. Ideal readings at plus and minus sixty degrees are identical. Linearity also deteriorates near the ends. The data sheet gives a center near 900 millivolts at ninety degrees and a slope magnitude of approximately ten millivolts per degree nearby. Decide whether the test needs direction, magnitude, or absolute phase over a full cycle. That last case requires another reference or a different measurement method.

Distribute the 125 MHz oscillator to the reference and test paths using appropriate signal conditioning. Sharing the source avoids the continuous phase rotation of two free-running oscillators. After splitting, attenuating, or coupling, check the actual levels at both detector inputs. For a square-wave source, extracting the same fundamental under comparable conditions can keep unequal harmonics and clipping from shifting crossings. Record the detector's magnitude comparison when either level changes appreciably, so the phase result can be checked against amplitude changes.

Do not calibrate a static zero using two independent oscillators. Even two in-tolerance sources steadily change relative phase unless they are locked. A one-hertz difference accumulates one cycle of relative phase per second. ADC readings can follow both sides of the fold or average to an apparently stable middle level. Split one source for fixture calibration and select an independent-source test only if the application requires it.

Add a known delay to establish the local slope

A 125 MHz clock has an eight-nanosecond period and a quarter-cycle delay of two nanoseconds. For example, a coaxial cable with a velocity factor near 0.67 needs roughly forty centimeters of additional length for two nanoseconds. Add approximately that delay to bring a comparison that started near zero degrees into the middle of the range. Use the measured phase and voltage for the final setting. Cable length, adapters, and other components all contribute to the result.

After setting an output near 900 millivolts, add a smaller known delay in the DUT path. Note whether the output rises or falls, and check that removing the delay restores the baseline. An additional 160 picoseconds is two percent of an eight-nanosecond period, or 7.2 degrees. At ten millivolts per degree, the change from 900 millivolts is about seventy-two millivolts. The reading can move toward 828 or 972 millivolts depending on setup. Determine sign experimentally instead of relying on port labels.

Measure two controlled delay values on opposite sides of the nominal point to verify the local slope. If the slopes differ significantly, check path phase, input level, and proximity to the fold. Save applied delay alongside measured voltage. For example, thirty millivolts across a known span of sixty-four picoseconds defines the current fixture's local conversion, without treating a nominal data-sheet slope as calibration.

Swapping the two detector inputs ideally leaves the magnitude of their phase difference unchanged, so a swap does not establish which path leads. Apply the same small delay to the actual reference path and check for the opposite local response. Remove it and verify recovery. This comparison checks the sign stored by the acquisition software. If both delays move the output the same way, inspect for a fold crossing or a script that took the absolute value again.

Compare buffers within the calibrated section

Keep the reference path, attenuation, and load unchanged. Record the original buffer, then install the replacement at the same reference planes and log any cable movement. For a small shift, use the sign and conversion just established. If the replacement moves output close to either end, recenter or use a signed phase measurement. Do not extrapolate across the fold. Temperature or supply changes can also move the detector away from the calibrated range. Keep a center check in environmental tests.

For a temperature run, first measure fixture drift with the direct path substituted for the buffer. Leave both connections outside the chamber in place and compare detector output before and after warming. If the reference check also moves, account for drift from the direct path or the measurement circuitry.

Record whether the comparison used one shared source, the side that received the delay, the frequency, and both input levels. Report the difference with the direction and uncertainty from calibration. If a scope is used as a cross-check, deskew its channels and retain the same edge definition. Future tests can then map a voltage change back to actual timing and allocate receiver setup and hold margin in the proper direction.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.