Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Measurement and Acceptance

A 20 MHz crystal passes a hundred fast power cycles. Why might it fail after sitting overnight?

A board passes many automated cycles with its 20 MHz crystal returning at nearly the same point each time. The next morning one start takes too long. Check whether the automatic test established the intended cold-start conditions. During a short interruption the resonator can retain a carrier, while a debug lead or peripheral can hold the controller rail above its off voltage. Repeated starts from a residual state do not establish the fully discharged case.

Observe the actual oscillator supply during switch-off

Put the fixture command, oscillator supply at the controller, reset and clock on one timeline. A source output indicator proves the upstream switch changed state. At the device pins, verify when the amplifier no longer has the supply needed to sustain oscillation. If firmware independently gates the oscillator, check the hardware or control status. A disabled clock buffer can stop its output before the resonator decays.

Microchip's oscillator allowance method calls for power cycling after each added series-resistance setting. Starting and sustaining an established oscillation are separate conditions. The wait for a 20 MHz crystal depends on the resonator network, supply and attached interfaces. Microchip's clock startup documentation also distinguishes a resume that begins with adequate supply from an initial power-up sequence.

Check the interface cables one at a time. Debugger I/O, a serial connection or another always-on module can source current into an ostensibly off board. Where permitted, verify the fully isolated configuration and keep its voltage and current traces. Removing an interface can affect load and software, so check the representative final assembly again. If the board has an approved discharge path, record how the fixture uses it during the off interval.

Confirm both ring-down and electrical discharge

Observe the decay envelope with an approved high-impedance point or validated low-loading pickup. A probe can add capacitance or loss and shorten the measured decay. Compare startup on a reference board with and without the pickup and keep termination details. Trigger the capture from the supply or switch marker and use a separate check for switch-event pickup.

For scale, suppose the undriven 20 MHz resonator network is approximately linear with effective Q of 40,000. The amplitude time constant Q divided by pi and frequency is about 0.637 ms. After 0.20 ms, about 73% of the initial amplitude remains. After 4.0 ms, about 0.19% remains. This assumes drive has already stopped, and supply state and load can change the actual result. Use the estimate to choose a capture length, and verify carrier and voltage independently.

The carrier can decay before the supply is discharged. Suppose the oscillator rail has an approximate 2.0 ms discharge time constant and starts at 3.3 V. After 4 ms it would still read around 0.45 V. A cold-start setup requiring less than 0.10 V would need around 7.0 ms even before any required hold time. Diodes, switches and backfeed can change the actual curve. Use measured voltage and the controller's specified conditions.

Qualify wake and cold start separately

For the short-interruption test use the normal quick-restart sequence and record actual off time and remaining carrier. For the cold-start group, return relevant supplies and the sample temperature to defined initial conditions and eliminate unintended backfeed. Use the same supply ramp, timing window and valid-clock definition. Alternating short and long off intervals on the same unit can show the effect more quickly than repeating only the short case.

If some long-interval starts fail, preserve the crystal envelope, rails and status from the first failure. When only the short tests pass, the aggregate result cannot establish cold-start margin. A controlled series-resistance or gain check can be more informative than changing the counter trigger. If both conditions fail, check the broader supply, load and connections first.

Repeat both tests on the original and candidate 20 MHz crystals. Retain actual off interval, temperature and first qualified clock time. If a supplier report lists only a switch delay, ask how the fixture demonstrated that the previous state was gone. Count wake events and fully discharged starts against the requirements that apply to each.

Fast repeated cycling can also leave the board warm. Later runs may have discharged rails while still starting at a higher local temperature. Keep a low-disturbance temperature point and compare short restarts with thermally settled starts. Mark the first chamber start and restore the specified conditions for further repeats.

Add timestamps for carrier dropping below the measurable floor and for rail discharge to the required initial state. Measure any remaining hold from the later event. This defines the initial condition more reliably than time since the off command.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.