A supplier sends a selection page that mentions AEC and lists several series in the same package. The ordering code you need specifies a frequency, tolerance, and packaging option. The approval decision depends on whether that configuration falls within the qualification report. Align the device type, applicable standard, and ordering code with the tested models and processes before adding it to the project-approved list.
Passive quartz crystals and active oscillators can use different qualification bases. AEC-Q200 Revision E, Table 11, lists stress tests for quartz crystals. SiTime's SiT8924B datasheet identifies AEC-Q100 qualification and an extended temperature range. Epson's automotive selection guide also points users to specific AEC-Q100 or AEC-Q200 products. For active oscillators, verify which standard the manufacturer claims for the exact part. A blanket rule for all oscillators could exclude a qualified candidate or admit a part supported only by marketing.
Trace the ordering code to the qualified samples
Read the full code field by field, including series, package, temperature range, frequency, voltage, tolerance, output, and shipping format. One suffix might change reel quantity while another changes the package or screening. Use the latest manufacturer ordering instructions. If a report covers a family or uses representative parts, ask how construction, material, assembly process, and site cover this code. A frequency change can involve a different crystal construction. The manufacturer is in a position to explain the basis. Keep the ordering diagram and manufacturer explanation when a change is limited to reel quantity.
Look for test method, items, samples and source, conditioning, acceptance before and after stress, and results. A cross-reference sheet for parts and report numbers often supplies the necessary coverage without disclosing the manufacturer's process details. When a condition is missing, state the actual vehicle temperature range, assembly process, and customer requirements. Ask for relevant existing evidence or additional qualification. Manufacturer qualification still leaves the project team to verify in-board performance, reliability, and operating conditions.
Worked example with two similar-looking candidates
Suppose a board must operate from −40 to +105 °C. Two candidates have the same nominal frequency and package. Part A covers the temperature range but comes only with a company quality-system certificate. Part B's datasheet identifies the temperature option, and a qualification ID and manufacturer confirmation cover the package and assembly process. Start the project review and sample plan with B. Keep A pending and request qualification evidence for its code. A quality-system certificate describes management within its scope without listing the stresses Part A passed.
Suppose purchasing later changes the last suffix on B to order a larger reel. The ordering instructions say it changes the shipping format, and the manufacturer confirms the qualified device is the same. Continue referencing the qualification report and ask the SMT team to check reel handling and feed orientation. A change to the temperature option or package calls for a separate explanation of qualification coverage. The two edits can look equally small on a purchase order and still need different evidence.
A production line may also have used an industrial version interchangeably in the past. For two internal customers, convert the qualified and industrial markings into separate receiving checks. Even written confirmation of identical outlines and electrical parameters leaves each project to use its approved identity. Add a real receiving-label example and point out the code fields the inspector needs. During a later review, trace one item back to its evidence, such as which representative package supports the temperature-cycle report.
Carry the approval into ordering and change control
The qualification record should include full manufacturer part number, temperature grade, standard and revision, qualification ID, covered sites or processes, supplier response, and project approval. Reviewers should be able to distinguish the product specification, factory information, and work still due on the project. Assign customer production part approval or material declarations to the appropriate owner when required. The next vehicle platform revision can then trace the previous documents and find any change requiring a resubmission.
At receiving, compare the approved code and label to intercept a general industrial part ordered to the same frequency. When a change notice arrives, confirm which report revision applies to the shipment and whether the manufacturer has requalified the device or documented extended coverage. A packing-only change may call for a feeder trial. A device, package, temperature-guarantee, or assembly change goes through project quality under the customer's approval rules. That preserves the connection between what was ordered and what the lab approved.
