One assembly uses a CC2652R and another uses a CC2652RB. Both list 48 MHz, and a supplier offers the same external clock part for both. Identify the high-frequency reference each configuration actually needs. Mixing processor speed, externally purchased quartz, and a resonator inside a package can leave one build short and populate an unnecessary device on another.
Determine which source the radio needs
According to TI, the CC2652R can derive its high-frequency system clock from an internal 48 MHz RC oscillator or an external 48 MHz crystal. It requires the external crystal for radio operation. A successful processor timing test does not establish a valid RF reference. The CC2652RB offers internal RC, internal BAW, or external 48 MHz crystal paths. Its radio can use BAW or an external crystal. TI's migration guidance describes using the high-precision resonator inside the package to omit external quartz. Verify which path the actual assembly uses.
For CC2652R, connect X48M_P and X48M_N according to the device's crystal design. The MCU drives a passive resonator. Do not place an active 48 MHz CMOS oscillator on the original lands because frequency matches. An external active reference proposal needs documentation of an applicable input mode and conditions. A generic clock pin on another device family does not establish those requirements.
Relate the reference requirement to RF error
As an illustration, +20 ppm at 48 MHz is +960 Hz. In an ideal synthesis example that transfers the fractional reference error, +20 ppm at 2.4 GHz would be +48 kHz. Neither figure establishes a TI radio specification or protocol limit. Use the actual system budget and account for temperature, aging, direction of testing, and frequency correction. The example explains why a reasonable CPU timing measurement does not establish RF performance.
For the passive option, obtain exact frequency, load capacitance, maximum ESR, drive rating, temperature, and the frequency error components. Link the drive settings and capacitors to the board and software revisions. Check that supplier samples are at comparable temperature and load grades. If you tuned trial capacitors to pass, retain the resulting values and the difference from the original production design. For the internal-BAW option, qualify the complete MCU order code and configuration. The resonator inside it is not a component for stores to issue separately.
Run a first article through radio operation
Build an original external-crystal version and an approved BAW version for comparison. Record MCU order code, board revision, and software. After startup, exercise the actual radio modes at agreed supply and temperature conditions. Capture which high-frequency reference was in use and whether it became ready before radio operation. If firmware waits for a clock switch, preserve the activation timeline. A passing device ID or register read can be followed by transmit, receive, and wake tests.
Review the low-frequency clock separately. Removing high-frequency quartz does not decide the low-frequency timekeeping architecture. TI discusses the 32.768 kHz path separately. If equipment must reconnect within a time window after sleeping, record both low-frequency timing and high-frequency startup. A reduced BOM can introduce a distinct MCU, firmware qualification, and testing requirements. Keep the supply options distinct pending approval.
Set up an alternate qualification record for the original external crystal as well. A candidate with a different load can pass a room-temperature RF trial. Extend validation to startup limits, outdoor temperature, and any long-term error requirement. Verify CL and ESR for each exact code. The device data identifies the crystal, and startup and radio measurements identify the MCU, loading, and software. Retain the package drawing and approved combinations for field service.
Keep board revisions and serials if stock serves both MCUs. If external crystals are scarce, issue them only to an approved board. A build using the internal reference may fulfill another order, subject to the customer's hardware approval. Identify the physical crystal location on service records, and verify any newly offered MCU suffix and lot. Record the end of any temporary substitution and disposition of remaining material so quality can identify the affected work orders.
Give purchasing and manufacturing the same scope
For an external crystal, record the full order code and supporting components together with the approved MCU. For internal BAW, specify the clock-related do-not-populate positions and software. If one line builds both, verify the MCU, crystal position, and programming job at first article. Service can then identify the actual reference when a reported 48 MHz replacement fails. The deliverable is a qualified wireless configuration, with 48 MHz as one of its requirements.