A CDCE913 on the bench accepts both frequency profiles through I²C. After EEPROM programming and a power cycle, the old script cannot find the device. Check the S1/SDA and S2/SCL assignment. Those pins serve the serial port at the factory and can be assigned as control inputs. After loading the new nonvolatile configuration they may cease to provide I²C. If still wired to an active bus, traffic can also look like control transitions.

Establish the pin roles

TI distinguishes the two dual-function pins from S0, which is always a control input. The dual-use pins start as SDA and SCL and change after the corresponding EEPROM setting becomes effective. With serial operation selected, their internal control values are zero and only S0 selects between the available control states. The factory diagram uses S0 to enable or tristate outputs. It does not contain two ready-made custom frequencies. Preserve the programming function if ongoing serial access is required. If the design reallocates both pins, establish a working factory and service path in advance.

List the permitted S0, S1 and S2 combinations. An output changing from 24 MHz to 48 MHz goes from about 41.67 ns to 20.83 ns per cycle. Neither endpoint frequency gives a guarantee about a clean transition. Determine whether downstream logic can be held in reset or mask the clock while switching. Capture the real transition and measure the first usable edge, shortest pulse and interval between the old and stable new clock. Coordinate the selection lines and downstream reset when extra pulses are unacceptable.

Recovery depends on the power wiring

Separate writes to active registers from EEPROM persistence. TI describes individual configuration bytes taking effect as they are received, so even a block write can pass through interim states. Follow the EEPROM CLKIN and supply conditions and check EEPIP before subsequent writes. A bus acknowledgement does not establish that all data persisted. Run a cold power cycle and verify the resulting frequencies and startup behavior. If the new image disables serial access, save the written profile in advance and verify an available means to read it back.

TI describes temporarily restoring the serial pin function when VDDOUT is forced to ground. Examine the supply wiring first. A shared output rail cannot be casually grounded at a test point. Use an isolated supply, jumper or fixture path only where the board supports the documented conditions. Do not document that recovery as a field action for boards without an independent path. A future service provision needs a defined way to return the board to its production wiring.

Compare the old and new boards without relying on processor firmware that itself needs the generated clock. Check startup pin roles, outputs in each allowed selection and loading in standby. If the pins still appear on shared I²C, test with actual bus traffic. Save serial-access tests separately from frequency-switch traces so the driver does not classify an expected missing acknowledgement as intermittent hardware.

Keep the device suffix, profile revision, pin roles, measured outputs and power-cycle result on one production record. A replacement received in factory configuration needs the board-specific programming and verification. The same chip marking and a correct warm-reset frequency do not prove the intended nonvolatile profile is installed.

Check whether a factory-default replacement can bootstrap the board. If the processor needs Y1 before it can execute the configuration script, an inactive output or a bypassed reference can prevent that script from running. Prove that an independent factory programmer can load a blank part and that the board then starts after a power cycle. If devices are preprogrammed upstream, associate the image revision with incoming identification. Keep default and programmed spares distinguishable.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.