On a board with a CDCM6208, a 25 MHz quartz crystal starts promptly, but a downstream receiver sees a clock only after about ten milliseconds. A manufacturer's graph shows a crystal startup around 200 µs. These observations refer to different points. The data sheet separates power rise, crystal startup, reference counting, feedback counting, calibration and lock. The crystal plot describes only one of those stages.
Observe the reference, output and lock separately
TI shows a typical crystal startup of about 200 µs in its NX3225GA 25 MHz example and notes that startup can take several milliseconds. The clock IC uses an amplitude detector. An initial low-amplitude waveform at the crystal is not evidence that the amplitude detector has accepted the reference. Use a suitably low-capacitance measurement, and keep a control run without a probe on the crystal node.
After the crystal becomes usable, the device counts about 64,000 clock cycles at the phase-frequency detector input. This is followed by a feedback timing interval of similar scale and calibration using about 128,000 PFD reference cycles. Identify the selected primary or secondary input and its configuration. The clock at a physical input does not by itself establish which reference drives the PFD or at what frequency.
A third observation separates output activity from the lock indication. TI shows the outputs turning on after calibration and the lock indication asserting after a further check. Release a downstream receiver only when its clock requirements are met. Capture the supply, reset, reference, generated clock and status on a common trigger. Verify what the status pin is configured to report before interpreting it.
Express the counters in milliseconds
Suppose the actual PFD input runs at 25 MHz. About 64,000 cycles take 2.56 ms, and about 128,000 cycles take 5.12 ms. Using 2.56 ms as a rough feedback estimate gives 10.24 ms for the three counter stages. Power rise, actual crystal startup, the loop response and the lock detector are additional. The feedback interval also depends on the device variant and settings. Use TI's applicable estimate for a formal budget instead of treating 10.24 ms as a maximum.
With a validated alternative configuration at 12.5 MHz, the reference counter takes about 5.12 ms and the calibration interval about 10.24 ms. Both can change while the same 25 MHz crystal remains on the board. This example compares the cycle-dependent timing. An actual configuration change requires checking the valid input, feedback, loop and output conditions together.
To isolate part variation, keep the same board and configuration while comparing crystal lots and record the time at which the crystal becomes usable and the later time of first output. For the other control, retain the same crystal and compare approved clock configurations. If the long interval follows configuration while the crystal startup is similar, investigate the PFD and calibration sequence. If the crystal startup itself shifts with lot or temperature, investigate load, ESR and drive.
For an intermittent failure, plot the measured intervals from repeated trials. Keep the same trigger and capture length and separate cold starts from short power interruptions. If a trial never reaches a valid clock during the capture, record it as beyond the measurement window. Assigning it the window length would conceal potentially longer waits. Retain a short waveform after first output to see whether its period is still moving toward the target.
Identify what an active reference can improve
A 25 MHz active oscillator can feed a suitable external input when the board is designed for that signal. Check its output logic, coupling, termination and enable behavior. The active device also has a startup time. Replacing the crystal changes that part of the budget, while the device still has subsequent clock-dependent waits. Put the oscillator's own startup requirement on the part specification and keep the receiver-ready time as a board-level requirement.
Record three observations for qualification: reference ready, first output, and the point at which the output meets the system clock requirement. Retain the supply ramp, temperature, probe point and trigger definition for each. If a receiver needs a valid clock within five milliseconds of power-up, check the counter budget at the actual PFD frequency before selecting a faster-starting reference.
