Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

A 2520 crystal sits under a shield can. Should purchasing inspect to 0.60 or 0.65 mm?

The prototype starts with the shield loose and occasionally loses its clock when the cover is secured. Mechanical clearance is a fraction of a millimeter. The BOM says 2520, and the two quotes agree on the nominal plan dimensions. Put maximum body height, installed standoff, and shield and board deflection into one cross section. A package name or a marketing headline cannot establish the mechanical fit.

A single document can give two height figures

The initial Abracon ABM10N datasheet describes a 2.5 × 2.0 × 0.65 mm package and separately presents a 0.6 mm maximum in its feature list. That 0.05 mm discrepancy needs clarification. Send the manufacturer the page, date, and exact quoted part and ask for the controlling dimensions, datum, tolerance, and drawing revision. Keep a low-clearance project on hold pending that answer. As another example, Epson's item specification for FA-20H Q24FA20H00260xx explicitly states 0.55 mm maximum in the side view. The procurement team can require that type of evidence.

When a quote says height 0.55, ask whether it is typical or maximum and where it is measured from. Establish the datum from the mechanical drawing. Keep the revision linked to the full ordering number and purchase specification. A drawing maximum can be used in a worst-case calculation for the device it covers. Confirm the height for other frequencies, families, and ordering options. The examples describe height evidence. Electrical approval is a separate requirement for any substitution.

Calculate what is actually left under the shield

Suppose the drawing gives a worst-case 0.72 mm from the PCB datum to the shield underside. Assembly qualification gives a maximum 0.05 mm solder standoff. Shield and local board deflection need another 0.06 mm combined allowance. The package budget is 0.61 mm. Use the same datums and avoid subtracting deformation already included in the drawing. A 0.60 mm body would leave 0.01 mm. A 0.65 mm maximum would exceed the budget by 0.04 mm. The two figures yield opposite answers for the same quote.

Check the tolerance stack against the assembly. Printing, adhesives, local copper, and solder mask can affect the measurement datum. One corner of a formed shield may sit lower. Have mechanical engineering identify the most constrained placement and document stack thicknesses. On a bolted shield, use the production fastening condition. Include relevant pressure and deflection scenarios for the assembled product.

Validate fit without losing the drawing requirement

Measure unused parts and the assembled height on representative boards. Use a calibrated noncontact or appropriate low-force method for the package. Record the sample count, measurement points, highest readings, and uncertainty. Five samples measuring 0.58 mm provide trial data and do not establish a production maximum of 0.60 mm. Mechanical engineering can verify the budget with a maximum-height specimen or controlled gauge, and test the clock with the enclosure secured.

If a shield touches a crystal, retain the contact marks and board positions. Hold assemblies using the affected geometry. Do not push down the cover or select short components to ship without review. If crystals meet their controlling specification, investigate the board and cover stack. If parts exceed an agreed maximum, record the reels and confirm measurement methods with the supplier. If the specification remains ambiguous and the design is tight, keep the alternate pending.

Include hand rework if it is part of the product’s service route. Residual solder or debris under the body can change mounted standoff. Measure reworked and original production assemblies separately under approved processes. For a failure at only one edge location, record the board, package point, and matching point inside the shield. Determine what each supplier can independently measure. If the key surface is hidden after assembly, use a qualified intermediate inspection and supplement it with checks on the closed unit.

Put the height budget into the RFQ

Alongside 2520, specify the permitted maximum, datum, and required drawing, together with frequency, load capacitance, and ESR. Recalculate clearances when a new drawing is proposed. Inspect the received part to the approved specification and link the first-article build to the order. A cover that closes once is a prototype observation. Release the alternative after worst-case clearance and the assembled clock have been verified.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.