A reel marked 3,000 yields several dozen fewer devices than expected. The placer logged consecutive missing picks. The supplier cites its label and count record. A pick alarm means the nozzle did not carry the expected component. The pocket could have been empty, the component could have dropped, or the feeder could have misindexed. Preserve the tape and material records before assigning the shortage.
Locate the event on the tape
ASMPT's nozzle detection overview gives an empty pocket and a dropped component as possible explanations for a missing part. A sensor can verify presence on the nozzle during assembly, which leaves the shipment count to separate evidence. Keep the machine, feeder, program, load time, and reel ID. Photograph the area ahead of cover removal when possible, and preserve unopened tape around the alarm together with the adjacent fed section. Pulling off tape after a stop can erase the distinction between parts never packed and parts removed by the line.
Identify the normal leader and trailer using the packing drawing. SiTime manufacturing notes distinguish populated pockets from the leader and trailer. Empty tape is needed for loading and indexing. Acceptance concerns the net number of devices and any voids within the populated segment. If the supplier allows blank positions in the middle, ask how they are marked and whether populated quantity is made up elsewhere.
Reconcile four counts on the same reel
Suppose the label says 3,000. Production fitted 2,940, engineering used eight for trials, and 12 remain. That explains 2,960 and leaves 40. It describes a discrepancy, not the cause. If another 16 unique components were ejected and verified against the reel, 2,976 are accounted for and the gap is 24. The 16 are internal consumption rather than a supplier shortage.
If a retained section shows 24 visibly empty positions with the cover tape intact, record and photograph them and check the packing agreement. Allowed gaps with compensating parts later on the strip may leave the net count correct. Request supplier records of the affected segment. A short count also arises from duplicate sample issues or machine reports that count repeated attempts at one pocket. Confirm each quantity before assigning a shortage.
Review actual feeder and pickup telemetry
Retain feed steps, pickup vacuum or vision status, and ejection data. Four retries on one empty location can create four alarms while accounting for at most one position. Run a verified strip to check pickup height and indexing at the station. Correlate detected pauses with splices. If several reels fail on the same setup, investigate the line and program. If one section on one reel repeats, preserve the segment and compare it with the packing drawing.
Count a suspect reel separately. Use a validated vision or other approved method without opening it where possible, and follow component handling requirements. Whole-pack weight includes the reel, tape, and packing materials and cannot simply be divided by unit weight. If a small device or reflective cover prevents a reliable count, arrange a controlled count with the supplier. Record opening or repacking so it does not erase the original evidence.
Translate a contiguous gap into tape length. At a 4 mm pitch, 24 empty intended positions occupy about 96 mm. Measure with a consistent start and endpoint defined by the drawing. Record scattered gaps individually. A view taken after cover removal cannot show when a pocket became empty. Ask the supplier to check net-count records, packing stops, and outgoing samples. Validate the count method with a known full strip. For an urgent work order, calculate board capacity from verified installed and remaining components before requesting replenishment. Keep unknown quantities open and identify what evidence the supplier and the line each owe.
State net quantity and permitted gaps when ordering
Specify actual populated quantity, permitted empty ends, and how voids in the populated section are handled. Include replacement quantities, counting method, and discrepancy evidence. Once a shortage is verified, obtain the supplier disposition and update inventory from actual receipts. If machine ejection explains the loss, update the feeder and loss records while preserving the reel identity. Put labeled quantity, placed parts, verified internal consumption, and balance on one row for the next investigation.
