Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

You bought 500 crystals on cut tape. Why does the feeder need 400 mm of empty tape?

The piece count is correct, yet the placement machine stops before the first crystal reaches pickup. The components are fine. The tape is too short to thread properly. Even when a supplier has wound the strip onto a reel, receiving needs to confirm the leader and trailer. The count in the ordering system and the package that can actually run on the line are separate acceptance items.

The leader and trailer provide travel length

Table 15 in SiTime's manufacturing notes lists a 400 mm minimum leader and a 160 mm minimum trailer for its reels. A leader lets the operator thread the feeder, engage the cover-tape path, and bring the first part to pickup. A trailer leaves enough tape to index the final component through the mechanism. Use the applicable packing drawing for the offered product. For other manufacturers or a distributor respool, get the actual packing specification and check it against the feeder's minimum length and splice requirements.

Agree how to measure the leader. For example, determine whether it runs from the tape end to the first component or requires separate measurements for empty carrier and cover-tape extension. Feeding arrangements differ. Take a top-side photo showing the first device, sprocket holes, any splice, and a ruler, with feed direction marked. Include a view from the last component to the end so an unperforated cover-tape tail is not accidentally counted as indexable carrier.

Work out how many pockets the missing tape could consume

Assume a 4 mm pocket pitch and 500 components in a continuous strip. The populated segment occupies about 2,000 mm at that pitch. Adding a 400 mm leader and a 160 mm trailer gives about 2,560 mm in all. At the same pitch, the added lengths represent 100 and 40 pocket positions, respectively. These numbers translate length into pocket equivalents. A manufacturer's drawing can specify separate cover-tape and carrier dimensions, so inspect using its actual definitions and the feeder requirements.

If the line sacrificed the first 400 mm and last 160 mm of populated tape for these two ends, the equivalent loss would be 140 positions, leaving around 360 out of 500. The example assumes both lengths are entirely sacrificed with no other losses. Real lines may use splicing, an adapter, or controlled manual loading. Get the feeder owner's decision before buying and specify whether the supplier adds tape or the receiving facility handles it under an approved process.

Verify an added lead actually feeds

DigiKey's Digi-Reel documentation describes a distributor service that adds empty tape at the ends, aligns the sprocket holes, and respools the strip. For a similar service, check whether the splice obstructs holes, indexes consistently at the head, or blocks a vision feature. Material thickness can also affect pickup height. Index slowly past the splice and first devices, and log jams and empty picks. Stop if the cover tape snags instead of pulling harder through the feeder.

Keep the inner and outer labels traceable after attaching tape. The supplier may give both the source ordering number and a repacking identifier. Link them and confirm the populated count. When empty pockets appear, distinguish the agreed empty ends from unexpected gaps within the loaded stretch. If the machine skips positions, document the result for yield and planning.

If the supplier proposes two strips of 250, each needs the required leader and trailer. In the example each populated segment is about 1,000 mm. The two completed strips total about 3,120 mm, adding 560 mm of empty tape over one continuous strip. The order still contains 500 components, and the line now has another threading and first-article check. The previous setup does not automatically cover the new reel, its remaining quantity, or traceability. Include changeover time, consumption, and releasable work-order quantity when deciding whether the two shorter strips fit the production plan.

Also check for a twist before feeding. Mark sprocket and cover-tape positions on both segments. A mismatch can indicate a flipped splice.

Specify two separate acceptance quantities

Put 500 populated positions on the RFQ and require empty tape in addition, per the agreed drawing. Add the pitch, tape width, cover-tape path, leader and trailer measurement points, and splice policy. Let production budget first-article and changeover losses separately. At receipt, check the label and population, measure the empty ends, and complete the agreed feeder trial. Record the feeder model used for an accepted first article so another line can check compatibility. Hold electrically conforming material that cannot feed for approved repacking or replacement. Book it as line-ready only after the packaging passes.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.