Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

A crystal reel arrives marked 2520. When did its shelf-age clock start?

The receiving record carries an exact date. The reel label may show just four characters. The two fields describe logistics and a date defined by the manufacturer. A project requiring manufacture within twelve months needs the event represented by that code and a rule for boundary weeks. Guessing a calendar date from 2520 can give different results for otherwise identical reels.

Confirm the week code and what it applies to

SiTime provides a useful example in its manufacturing notes. The inner-box DATE CODE uses YYWW, with a two-digit year and two-digit work week. By that convention, 2520 means work week 20 of 2025. Ask which work-week calendar applies. Without it, the label does not establish a particular Monday or exact timestamp. Other manufacturers may use letters, internal lot codes, or a different order. Send the supplier a reel-label image and request the code definition and the production event it represents.

Record the raw code, interpreted date range, original pack status, and actual receipt date on the receiving card. Capture any bag-seal or reseal date separately. A new seal date can coexist with the same manufacturing week. A number on the top mark can also resemble a date code. For short marks, multiple lot codes, or unfamiliar formats, consult the manufacturer's instructions for the specific part and ask for a mapping to the individual reel.

Calculate a boundary case

Suppose the contract requires manufacture within twelve calendar months on receipt and both parties agree to use ISO week numbering. Week 20 of 2025 spans May 12 through 18. A shipment arriving on May 15, 2026 exceeds the limit by three days if manufacture was on May 12, 2025. If manufacture was on May 18, 2025, it is three days inside. The code 2520 by itself does not settle that shipment. Receiving can hold it until the supplier confirms the exact production date. Parties can also agree to use the first day of the week as a conservative rule and price the order with that rule in view.

The calculation applies to a contract that starts at manufacture. A requirement to retest twelve months after booking inventory uses the receipt rule agreed for the site. If both restrictions apply, put them into the ERP as distinct triggers, one for incoming acceptance and one for stock reinspection. A single date risks putting an old reel into stock as newly manufactured or repeatedly blocking a reel that already passed the correct checks.

Collect the evidence the retest is meant to establish

Epson's crystal device precautions note that extended storage at high or low temperature or at high humidity can affect frequency stability or solderability. Follow the purchase agreement and the part-specific requirements for storage records, package integrity, and time since opening. Choose evidence appropriate for the next operation. Material intended for reflow benefits from terminal wetting evidence and a representative assembly trial. A repair project with a narrow frequency range may also require retesting under the specified load and temperature. A board that happens to start addresses a different question.

Tie the test result to a reel ID and to the actual amount of inventory it covers. A reel with a complete history and acceptable results can return to stock under the approved rule, with its next reinspection date recorded. If a seal is broken, records cannot be matched to the reel, or a boundary code remains ambiguous, describe the open field in the hold record. Link the eventual supplier response to the label so later replenishment uses the same interpretation.

A supplier lot can also enter inventory in several shipments. One reel may have been opened and returned after six months. A late reel with the same manufacturing week can still be sealed. They share a shipment age rule and need distinct storage and retest histories. Retain each reel’s balance and pack state. Issue the conforming reel with the nearer reinspection date when permitted. Give reels awaiting evidence a separate status so planning uses releasable quantities. A warehouse transfer should preserve the original receipt date in addition to the transfer date. Replacing it with the new receipt date can wrongly postpone a retest.

For a code that crosses a year boundary, ask for its calendar dates. A sequence can pass from the last week of one year into the first of the next. Subtract actual dates instead of four-digit codes.

Put the date requirement where buyers and planners can see it

Make the relevant production event, week convention, label mapping, and boundary treatment part of the PO requirement. Planning can then manage usable stock and replacement orders with the same dates. A warehouse-wide age heuristic cannot identify the storage history of a particular crystal. When the supplier supplies the contractually required batch and date evidence, quality can apply the part and package criteria and carry out any required retest. Every reel marked 2520 then receives the same interpretation under the same contract.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.