Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

Both CS2500 inputs can show 20 MHz. Which one needs a purchased oscillator?

A clock diagram includes a stable reference and a synchronization signal. Both measure 20 MHz, so purchasing considers replacing one with a fixed source under a generic clock description. The Cirrus Logic CS2500 assigns the inputs different roles. Establish which must remain stable and which tracks another device before deciding whether to buy an oscillator, add distribution, or retain the synchronization path.

Identify the two inputs from their specifications

Cirrus Logic describes synthesizing a clock from a stable reference and using a hybrid loop to synchronize to and clean a noisy or intermittent clock. The timing reference REF_CLK_IN has a published 8–75 MHz range. CLK_IN for synchronization and frequency multiplication is specified at 150 Hz to 30 MHz. Twenty megahertz is inside both. Identify each actual source, pin, signal level, and supply, and check which mode is configured.

Check lock behavior when the upstream input disappears. A product may be expected to use a defined fallback or may only allow the output after reacquisition. Document input connection, established operation, loss, and recovery. A generic oscillator request needs an actual requirement for fixed frequency, tracking, or both. A product description saying intermittent inputs are accepted is not an acceptance test for interruption handling.

Calculate the consequence of exchanging two nominally equal signals

Suppose the original stable timing reference is 20 MHz and the product tracks a separate 20 MHz input. At +25 ppm, that synchronized input becomes 20,000,500 Hz. In an ideal two-times tracking example, the output becomes 40,001,000 Hz. This is illustrative, not a universal CS2500 behavior. A local oscillator at exactly 20,000,000 Hz can produce a closer-looking 40,000,000 Hz output in the same calculation while losing the required tracking. Establish which signal the output must follow.

A 48 MHz oscillator is inside the timing reference range and above the 30 MHz limit for CLK_IN. Pin assignment matters even when the package and electrical format match. Specify the range and actual operating mode for each input. Use a test fixture that provides the same roles rather than a single generic clock connection.

Measure both frequency and tracking

Verify timing-reference level, frequency, and startup at an appropriate point, then verify the synchronization input. A digital clock input needs an active source or an approved generated clock. A passive crystal needs an oscillator circuit. A supplier change on the active source still requires receiver and application checks. Verify fixed-frequency output under the applicable configuration. For synchronization, use a small approved input variation and see whether the output follows by the intended ratio. Test loss and recovery under the project's conditions.

Compare two reports only after identifying mode, electrical levels, and clock path. Phase noise at the oscillator output is not evidence of system synchronization. Link configuration and both input and output evidence to the first article. When a board exposes only one clock, use its configuration and schematic to identify it. For lock failures, check input assignment and mode before deciding which component is at fault.

Do not let a lab generator silently replace a missing production input during evaluation of a new connector or distributor. Record the actual source, input levels, and intended reference for each assembly. Verify how the output responds while upstream equipment switches on or off and the two inputs appear in different order. Match each state to the software setup used in the product. An alternate stocking record should identify the board and its load extremes, preventing unqualified reuse on the other port.

Document timing and synchronization separately

Record the stable reference's complete ordering number, supply, output, temperature, and board revision. If synchronization comes from customer equipment, record its input range, waveform, and interruption behavior rather than assigning it a purchase quantity. A proposed shared source or distributor needs review of the system's timing requirement. Test the actual mode on the production assembly, and document each clock's source for repair. Two readings of 20 MHz then lead to the correct supplier and test decisions.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.