A new board is fitted only with its backup battery and left overnight. Main power is first applied to read time the next day. For a DS3231, this differs from starting the RTC normally and then removing main power. To save battery life, the oscillator on first VBAT application does not start until the relevant VCC condition is met or the device receives a valid I²C address. Leaving a never-started RTC overnight is not a retention test.
Divide testing into two use cases. For a new assembly, record the order of first battery connection, first valid bus access, and first main power to verify production activation. For backup testing, set and verify time with normal power, clear or record the relevant status, then remove main power. Read time again after a documented interval. This second group tests timekeeping after the product has been commissioned.
A debug fixture may scan the bus even if nobody intentionally accessed the RTC. Save the host script and bus trace so fixtures that activate oscillators are not mixed with genuinely unactivated samples. Check voltages and power paths during the backup interval to rule out accidental power through signal lines.
If equipment must ship with correct time, define first activation, time setting, and the check after removing main power. Sign off initial startup and subsequent retention separately so failures can be assigned to production setup, the backup circuit, or timekeeping accuracy. Record the actual rail states around battery connection in both groups to detect unintended startup through fixture leakage or pull-up power.ADI DS3231 datasheet, first VBAT application and oscillator startup