Test equipment sends clock only as the measurement window opens, with at most 100 ns between control and valid output. Microchip specifies maximum output-enable times of 5 ms for DSC1101 and 20 ns for DSC1121. Cold power-up startup is a separate specification. With power maintained, the enable difference may determine whether capture can begin in time. If the design switches power off each time, 20 ns does not answer the power-up question.
Identify whether power or only the output is switched off
Put supply validity, enable transition, and the receiver's first sample on the same timeline. The 100 ns example also includes control-path delay, board propagation, and receiver detection, so the whole interval is not available to the oscillator. Confirm conditions and disabled current for the ordered output. Fast enable with circuitry kept active may affect battery life, so budget with actual standby duty cycle.
The receiver must recognize the first pulse
Stabilize the supply, then assert enable with the production amplitude and edge. Measure the first valid edge at the receiver pin. If the application constrains pulse width or first-frame errors, check the first pulse and receiver result as well. Repeat from a cold start with the supply rising from zero and record it separately from enable timing.
List disabled current, warm enable time, and power-up startup time separately in the RFQ. Mark the hard limit. A later change to power strategy can then be evaluated against the stocked part without guessing between milliseconds and nanoseconds. Microchip DSC1101 / DSC1121 electrical characteristics