A control board releases its clock after three milliseconds. Purchasing copies the Epson SG-210STF's three-millisecond specification and ±50 ppm limit into one row. The first lab sample produces pulses at 49,980,000 Hz after two milliseconds and enters a narrower band later. One inspector sees an output in time. Another sees an error above 50 ppm. The data sheet sets distinct conditions. The board needs to distinguish when the 50 MHz oscillator meets Epson's enable criteria from when the application needs the normal operating frequency.
Read the part-specific table with the timing chart
Epson identifies X1G0041710126xx as the SG-210STF at 50.000000 MHz in grade Y. Its operating range is 1.60 V to 3.63 V and −40°C to +105°C. Maximum CMOS load is 15 pF and frequency tolerance is ±50 ppm. The individual sheet lists a maximum start-up time of 3 ms from the supply reaching 90% of its final value. It also lists a maximum 3 ms from standby low to output enable. The family timing chart in the same file counts from the standby input's high threshold to enable. Epson's starting-output criteria include a high level of at least 80% of supply, a low level no greater than 20% and frequency within ±1,000 ppm of nominal. The start-up and standby events use different triggers, and the start criteria have their own frequency band.
At 50 MHz, 1 ppm is 50 Hz. The ±1,000 ppm start band is ±50,000 Hz, or 49,950,000 to 50,050,000 Hz. The ±50 ppm operating band is ±2,500 Hz, or 49,997,500 to 50,002,500 Hz. The example at 49,980,000 Hz is low by 20,000 Hz. It is inside the broader band, although voltage levels must also pass to establish enable. It remains outside the operating band. The three-millisecond figure does not by itself establish the time to enter the narrower band. A system that requires ±50 ppm at that instant needs an applicable written guarantee or a different release condition.
Capture initial output and settled frequency
For standby recovery, stabilize the supply, drive ST low, then apply a defined rising edge. Observe supply, ST and OUT together. Start timing at the specified high threshold at ST, not at the software command. For a power-cycle test, capture the supply ramp and its 90% crossing separately. Record the first full period, enable under the stated level and frequency criteria, and the first confirmed entry into the operating band. A slow log can hide what happened in the first milliseconds. Choose a bench setup that resolves the actual event. The data sheet includes probe capacitance in the CMOS load, so a high-capacitance probe can alter the waveform under test.
Choose measurement precision for the decision. In a simple one-millisecond direct counting gate, a one-cycle difference is a 1 kHz increment, or 20 ppm around 50 MHz. It can help distinguish the broad band from a large error. Near a ±2,500 Hz limit, a small number of such readings leaves little margin. A checked reference and suitable reciprocal measurement or statistical procedure can improve resolution. If the gate is long, record its start and end so that it does not average across the transition. Tie all measurements to the same part, board and operating state.
Document the receiver release requirement
A controller might need valid pulses in the broad window before later firmware calibration. An oscillator used immediately by a frequency-sensitive loop can have a different requirement. If samples meet the manufacturer's enable definition within three milliseconds but reach the project's ±50 ppm limit later, document the gap. Engineering can lengthen the wait, delay the clock switch or obtain a guarantee covering the intended conditions. For an abnormal waveform, first verify loading, ST levels and the supply ramp at the device.
Compare the two enable events on the same board. First toggle standby at constant supply and temperature. Repeat and record when the output has enough swing and reaches the broad band. Then run a full power cycle, allowing capacitors to discharge as required by the test plan. If the symptom appears only after complete power removal, investigate the supply ramp, threshold and reset sequence. If it tracks standby transitions, check the actual drive voltage and threshold. Keep the two sets of traces separate.
Include the source of each limit in the pilot record. Epson's three-millisecond enable limit, its operating tolerance and the project's time to enter the narrow band are three decisions. Ask the supplier for a capture with the triggering threshold if it tests the transition. A tighter deadline added after an order should go through engineering and purchasing confirmation before it becomes an incoming rejection criterion.
Put the complete 50 MHz part number, grade Y, measurement event, applicable band and observation method in the material and acceptance records. If the supplier only acknowledges three milliseconds, establish the triggering event and its conditions. Use samples to validate the proposed timing until the frequency deadline is resolved. Release the part when the enable time, operating tolerance and receiver sequence have applicable test or written evidence.
