Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

Why can a ±20 ppm Fox FO5HS be harder to approve than ±25 ppm at 50 MHz?

A supplier quotes a Fox FO5HS 50 MHz active oscillator at ±20 ppm as a substitute for an approved ±25 ppm item. Frequency, 3.3 V supply, and temperature range match. A smaller figure appears to make the approval straightforward. The Fox specification published by Abracon gives those grades different footnotes at that supply. They include different contributions to frequency error. Start with the system allocation and establish the scope the supplier actually guarantees. A new room-temperature measurement on an assembled board cannot account for all the missing terms.

Read the stability footnote alongside voltage and temperature

Open the FO5HS 3.3 V page and find the combination of −20 to +70 °C and 50 MHz. The ±25 ppm row carries footnote 2. It includes initial tolerance at 25 °C, operating temperature, supply and load variation, as well as reflow, first-year aging, shock, and vibration. The ±20 ppm row carries footnote 3 and includes room-temperature initial tolerance and operating temperature. Engineering can evaluate either option. A system approval based on in-service total error across the first year must use the corresponding scope. Put supply, temperature, frequency, and covered terms in the RFQ. Request its full code and the applicable page. The same stability number on a different supply page can belong to a different combination.

The final ordering diagram distinguishes supply, stability, temperature, frequency, and packaging. For this comparison, supply code C means 3.3 V. Stability codes D and E mean ±25 and ±20 ppm respectively. Temperature code F means −20 to +70 °C. Use those fields to catch a change in the offer. Still verify the complete manufacturer order code and specific configuration. A character definition identifies a field. Confirm that the combination can be ordered and that the documentation applies to the proposed material. Keep the distinguishing fields in the materials system so production does not treat all same-package 50 MHz items as approved alternatives.

Apply both offers to the same system budget

Assume the total first-year allocation for the 50 MHz active oscillator is ±25 ppm and the application meets applicable load, temperature, and supply requirements. At 50 MHz, 1 ppm is 50 Hz, so ±25 ppm gives ±1,250 Hz. The broader ±25 ppm scope can support that part of approval when its other conditions are satisfied. For the ±20 ppm option, the listed terms use 20 ppm and leave 5 ppm for effects it omits. Suppose engineering establishes an illustrative worst-direction aggregate of 8 ppm for those omitted effects. Adding the two contributions yields 28 ppm, or 1,400 Hz. The example exceeds the allocation by 150 Hz. The 8 ppm is a hypothetical budget, with no claim that Fox published that value. Leave the approval pending if the additional effects lack defensible bounds.

Check what the system requirement describes. A startup frequency target across temperature may focus on room-temperature initial tolerance and thermal behavior. Supply, load, and reflow still need review against the actual conditions even for short-term use. If the customer also requires a separate tighter room-temperature incoming check, ask the supplier whether it can guarantee that value. A broad combined limit tells little about whether an individual contribution meets a tighter requirement. The order can include one acceptance item for the room-temperature check and another for the claimed environmental and life coverage. Use the applicable conditions to disposition each.

Add a sourced coverage field to the offer comparison. Capture the applicable temperature range and footnote number, then summarize the included effects. Review it again on a new data-sheet revision. For example, if a board repair changes a 3.3 V design to a 2.5 V version in the same footprint, reopen the supply, load, and temperature review without relying on the old page number. A purchasing system with one stability field can carry the controlled specification identifier in the order notes. Inspectors can then trace a value that was copied out of the data sheet back to the conditions it represents.

Base the order on documentation and the board change on first article

Incoming inspection can verify part identity, output, and frequency under controlled supply and load. Retain the specimen and date for unpacking, post-solder measurement, and environmental testing. Three supplier readings at 25 °C can establish that the specimens have the expected nominal frequency. Reflow, aging, and environment need the applicable specification and approved tests. Agree on conditions, samples, and limits if lot-level reports are required. Run the approved item and the proposed replacement on the same representative board with each tied to its order code. If either fails its frequency check, the traced identity and fixture data help show whether it is a material discrepancy.

For production approval, pair passing incoming measurements with written coverage equivalent to the system allocation. If an offer covers only the two terms in the tighter grade and the project also specifies first-year total error, retain the qualified configuration or have engineering review the residual allocation. Samples can proceed as evaluation stock until the production substitution is approved. Record supply, temperature, covered effects, full manufacturer code, and applicable board revision so the next work order or repair can recover the decision.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.