Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

Which external clock components must change when moving from the FT2232D's 6 MHz crystal to the FT2232H?

A dual-channel USB board is moving from the FT2232D to the FT2232H. Stores still has a reel of 6 MHz crystals, and both migration drawings show 27 pF capacitors. Can the new board use the old clock parts? Start with the two frequencies in FTDI's migration note. The D device uses a 6 MHz reference and the H device uses a 12 MHz reference. The capacitor values are examples for the crystal circuits. Their presence on both drawings does not qualify the old crystal or establish the final capacitors for the new board.

Separate the reference clock from USB speed

In section 5.1 of FTDI AN_558, the FT2232D circuit connects a 6 MHz crystal between XTIN and XTOUT. Section 5.2 puts a 12 MHz crystal between OSCI and OSCO on the FT2232H and calls for ±0.003% frequency accuracy. The reference frequency, USB link rate and serial-port baud rate are distinct values. The chip uses its reference to generate other working clocks. If the purported H board shows a steady 6 MHz in the crystal path, verify the fitted IC, its clock component and the probe point before treating the result as acceptable.

Convert the percent specification to make the scale clear. ±0.003% is ±30 ppm. At 12 MHz this is ±360 Hz, for a range of 11,999,640 to 12,000,360 Hz. A nominal 6 MHz crystal misses the H target by 6,000,000 Hz. Even among 12 MHz candidates, the meaning of an accuracy line matters. Suppose a proposed crystal has a ±20 ppm initial tolerance and a separately specified ±15 ppm temperature term. A worst-case sum gives ±35 ppm or ±420 Hz, before considering other error sources such as load mismatch and aging. Where the crystal vendor supplies a composite figure, record what the figure includes and avoid summing the same component twice.

Why the two 27 pF parts still need a calculation

A passive crystal is connected between two oscillator pins. Each external capacitor goes from one of those pins to ground. Looking into the circuit from the crystal's two terminals gives an approximate capacitive load of C1 × C2/(C1+C2), plus an allowance for parasitics referred to the crystal terminals. FTDI shows 27 pF on each side as an example. If the effective stray term is 3 pF, the two 27 pF parts contribute 13.5 pF in series, and the estimated total is 16.5 pF.

Now suppose the replacement crystal has a rated load of 12 pF. Under the same simplified assumptions, the external series combination should provide 9 pF. Two equal 18 pF parts give that starting point. Leaving the two 27 pF parts changes the operating load. Obtain the crystal maker's recommendations for the actual circuit and check the result on the assembled PCB. Both examples use a hypothetical 3 pF stray term. It is not a measured property of either FTDI reference design.

Read the exact crystal's load, equivalent series resistance, drive level and mechanical drawing. The FT2232H data sheet recommends a parallel-cut crystal for its crystal circuit. After changing capacitance, evaluate both frequency and start-up. Use a measurement setup that accounts for added probe load. One room-temperature enumeration test establishes behavior for that unit and condition, while the production review also needs supply and temperature boundaries and the limits of the approved components.

A powered oscillator changes the wiring

A powered CMOS oscillator already supplies a clock waveform. FTDI shows the D embodiment feeding a 6 MHz output to XTIN and leaving XTOUT open. For the H device, FTDI shows a 12 MHz output to OSCI with OSCO unconnected. Redraw the clock input circuit for the chosen approach. Review the source supply, source logic levels, receiving input specification and jitter conditions. Section 6.3 and Table 6.1 of the FT2232H data sheet describe the oscillator input. A module in the expected package still needs its pinout, enable function and output type checked against the drawing.

Purchase descriptions such as “12M crystal” can refer to either a passive resonator or a powered clock source. State which is intended before supplying the package and frequency. For a passive crystal, list load capacitance, ESR and drive constraints. For a powered source, list supply, CMOS output, enable and applicable clock quality requirements. Require the resulting ordering code to match the circuit that was qualified.

Build a first-article test around the migration

Keep separate check sheets for the D and H board revisions. Add the required frequency, net names and source connection from sections 5.1 and 5.2 to the relevant drawing. If a new board does not enumerate, confirm supply and reference-clock behavior first, then investigate the USB path, configuration and host events. If enumeration works but both channels do not sustain the required workload, record negotiation and channel behavior separately. A device recognized by the host has cleared one milestone, which is different from meeting the application's throughput and recovery requirements.

Use the same host and a known-good cable when comparing examples. Evaluate cold power-up, repeated connection, simultaneous traffic on both channels and recovery from an interruption. If the fault is temperature dependent, capture supply, reference start-up and host events during the failing attempt. The working trace after reconnecting may not explain what happened. Purchasing then has an exact device and clock specification, while engineering has repeatable evidence tying those selections to the H board's required operation.

A three-column bench record is helpful when the symptom is intermittent. In the first column, record the fitted bridge and clock component, along with the board revision. A photo of the markings can help distinguish otherwise similar repairs. In the second column, identify the clock-source topology, probe point and observed reference frequency. In the third, record whether the host enumerated, whether both channels passed together, and how long they took to recover after a power cycle or reconnection. An old D board and a new H board may both show a device name in the host, yet only one may have been run under simultaneous load. Keep those observations distinct so that a later lot substitution or a firmware update can be retested on the same basis. Approve the frequency, component type and test conditions on the same revision-controlled sheet.

Manufacturer references

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.