Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

Both Jauch JXS22P4 versions are AEC-Q200 qualified. Does a 26 MHz crystal order still need HMR?

A replenishment order for an automotive board calls for a 26 MHz surface-mount crystal, and the supplier quotes Jauch JXS22P4. Engineering previously tested an HMR sample, but the old purchasing system retained only the family name. To decide whether the quoted 26 MHz passive crystal can replenish the original configuration, establish the shock conditions used in that approval and whether the complete order number includes HMR. Jauch's data sheet describes all versions as AEC-Q200 qualified and identifies HMR as a separate high-mechanical-reliability option. The automotive qualification is only part of the ordering decision.

Record both shock conditions in full

The general Jauch table lists greater than 100 g using a 6 ms half-sine pulse. The ordering guide identifies HMR with a 3,000 g, 0.3 ms half-sine pulse. The nominal peak comparison against 100 g is 30 to one, while the durations differ by a factor of 20. Include waveform, amplitude and duration in the supplier inquiry and ask for evidence that applies to the complete quoted configuration. Record any manufacturer conditions for mounting, directions, repetitions and acceptance. An end-product drop report and a component-level shock rating refer to different test articles. Preserve the identity and test conditions of each.

The area under an ideal half-sine pulse illustrates why peak acceleration alone cannot compare the conditions. Velocity change is peak acceleration times duration times two divided by π. At the comparison baseline of 100 g and 6 ms, that is about 3.75 m/s. At 3,000 g and 0.3 ms, it is about 5.62 m/s, or about 1.5 times the first area. The general specification says greater than 100 g. The calculated baseline is not an exact failure threshold. The pulse area also leaves out the real assembly response, which depends on board support and orientation.

Suppose the product requirement is a 1,000 g, 1 ms half sine. The same calculation gives approximately 6.24 m/s. HMR exceeds the example peak, yet its pulse lasts only 30% as long. Have quality put the complete project requirement in the inquiry attachment. If the supplier can identify an HMR configuration, keep it as a candidate and test it using the relevant product input. This resolves the longer pulse requirement before material is issued, without changing the project's actual shock requirement to match an existing test report.

Check the electrical option and receiving evidence too

The data sheet places 25 to 29.999 MHz in one fundamental-mode band with 60 Ω maximum and 30 Ω typical series resistance. The exact part still needs its 26 MHz frequency, chosen load capacitance, temperature grade and other electrical options. Suppose the project's circuit requirement is a four-to-one start-up margin against maximum crystal series resistance. The negative-resistance magnitude must reach 240 Ω in that simplified project calculation. A measured 220 Ω falls 20 Ω short despite looking generous against the typical value. This is an example project rule, with no manufacturer claim about the required multiplier. Attach the board, supply, temperature and load conditions to the test evidence.

Photograph the device and packing. The data sheet shows load-capacitance marking codes, which can help identify that option at 26 MHz. It gives no separate HMR top-mark rule that receiving can use for approval. Have the supplier link the reel label, full ordering number and lot paperwork. If a cut-tape label omits the option, obtain that evidence before issuing the parts. A room-temperature frequency or resistance sample still belongs in the electrical record. Its result cannot establish a reel's mechanical option.

If receiving performs destructive sample tests, mark stressed specimens separately so they cannot return to a production reel. Keep the installed position and orientation for failed samples because several part-to-product orientations may occur. An unloaded fixture trace can monitor the machine. Preserve fixture and board records using the actual production brackets when approving the end product. Identify accelerometer position and direction in the drawing so another lab can reproduce the measurement. A bare-part report can help confirm the component configuration while the assembled-board test is scheduled separately.

Agree what each order actually requires

If the original product approval specifies HMR, write it on the 26 MHz passive crystal purchase order and obtain supplier confirmation of the full part number and applicable shock conditions. If the legacy file gives only AEC-Q200, engineering must establish the actual product shock requirement before deciding which configuration to retain. If trial builds are needed, keep the two options in separate traceable lots. Use the same board revision, capacitor values and assembly route, and retain pre- and post-test readings. When continuous clock is required during the event, add powered monitoring and event capture. A restart after the assembly settles measures a different outcome.

Close the approval with three facts: the mechanical option tied to the delivered part number, the product shock input, and the condition under which the first article passed. A missing option needs supplier evidence. Missing project or trial conditions need an engineering and quality decision. Issue each mechanical configuration to the service, pilot or production orders that actually approved it.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.