Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

After switching the LAN8670 to RMII, why does the PO change from a 25 MHz crystal to a 50 MHz clock?

A single-pair Ethernet product changes its controller interface from MII to RMII, and its BOM retains a 25 MHz passive crystal. The network remains 10BASE-T1S. The relevant change is the PHY-to-host interface, the clock input, and whether the PHY is a LAN8670, LAN8671, or LAN8672. The original crystal can operate normally in its old circuit while failing to supply the new interface. Review the material and interface changes together.

Select the PHY before selecting a reference

Microchip's clock circuit chapter lists separate requirements. The LAN8670 and LAN8672 in MII or SC-MII need a 25 MHz reference, which may be a crystal or a specified single-ended oscillator. The LAN8670 and LAN8671 in RMII need a 50 MHz single-ended oscillator. For the first group, a crystal connects between XTI and XTO, or a suitable 25 MHz clock drives XTI. For the second, use REFCLKIN. Give the supplier the exact PHY, interface, and source. Identify the active path if both circuits appear in a schematic.

If reusing a board, verify power, bypassing, the clock route, loading, and any unpopulated options. The pin table says XTO must be unconnected with less than 10 pF stray capacitance when XTI receives a single-ended oscillator or the LAN8670 operates in RMII. Have engineering reconcile this with any old crystal or test probe. If the host already provides 50 MHz, verify its continuous output and electrical behavior before buying an additional oscillator.

Convert the same ppm limit at both frequencies

The clock circuit section specifies ±100 ppm or better. At 25 MHz this represents ±2,500 Hz. At 50 MHz it represents ±5,000 Hz. The periods are 40 ns and 20 ns. A hypothetical 50,003,000 Hz reading is +3,000 Hz, or +60 ppm at 50 MHz. It fits that frequency example and still needs its output, power, and aging checks. On a 25 MHz report, +3,000 Hz represents +120 ppm. Confirm the actual reference measurement point and nominal value before calculating.

Acceptance conditions depend on device type. A passive crystal needs its load, ESR, drive, mode, and temperature. An oscillator needs output, continuity, duty cycle, and an accuracy definition. Distinguish room-temperature tolerance from stability covering aging. Microchip also specifies −40 °C to +85 °C ambient as the guaranteed industrial range for the 25 MHz external oscillator choice in MII or SC-MII. A wider-rated oscillator alone cannot extend the PHY's guaranteed use. Verify any wider equipment requirement against the actual documentation.

Verify that the first article sees the required clock

Keep the controller interface, PHY configuration, provider, designator, and test point for each version. Check power, reset, and clock availability before traffic and recovery. Detecting 25 MHz on XTI does not establish a valid 50 MHz REFCLKIN. With a host-supplied clock, check startup, software reset, and wake against the chosen PHY conditions. Label supplier waveforms as device output or actual receiver measurements, and specify the load.

Where both versions run together, keep separate stocking and work-order records. Include which old loading parts remain fitted or are omitted. Have a shared test bench select the appropriate frequency and test point when it scans the board. Service should identify the physical PHY and current interface instead of assuming all LAN8670 boards match. Keep the active and passive samples traceable to their configurations.

For a central clock BOM, include output control. Verify the power-up default when a part has optional shutdown or enable, and check that its clock is available before reset releases. Where a different module provides timing, identify which one must start first. If the host stops its output during sleep, verify that the PHY enters an allowed condition. If reference interruption is unacceptable, qualify a continuously available path. Support the sourcing choice with actual startup and power records.

Reconcile stock the same way. Before reallocating a 50 MHz oscillator intended for another board, verify supply, output, package label, and receiver conditions. Transfer the approved placement orientation, bypass network, and fixture settings to the manufacturer. Track receipts, samples, and released stock for the old order separately. A shortage does not authorize remarking a similarly sized device.

Order the validated combination

Ask the supplier to confirm the full device, oscillator type, frequency, documentation, and temperature. Replenish the old MII build against its approved 25 MHz source. Order or specify the source for the qualified 50 MHz RMII path. Document empty positions and applicability when the product supports both. Request the applicable conditions and stability evidence for a generic automotive or 50 MHz quote. Release only the hardware and software combination actually qualified.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.