A board uses a 25 MHz passive crystal. Firmware drives the LMK00105 OE pin high, but the oscilloscope still shows a flat interval before clock pulses begin. Another assembly uses a 50 MHz active oscillator. Its buffer also waits, though for a different interval. Look at two signals first. The source frequency determines the spacing between edges, and the buffer’s synchronous enable determines when the clock starts passing through. Watching both separates a slow-starting source from a buffer that is waiting to begin.
Keep crystal startup and buffer enable separate
The LMK00105 can select its differential clock input or the OSCin path with the oscillator circuit. TI illustrates the latter with a 25 MHz fundamental-mode AT-cut crystal. In that circuit, the passive crystal and the IC’s oscillator circuit build up a signal together. The loading network, assembly, and temperature can affect the cold start. The startup starts once the power and input selection conditions are met. If OE is already asserted during power-up, a single measurement at the buffer output cannot tell you how much time the source and the buffer took separately.
For a board with a 50 MHz active oscillator, identify its actual input, confirm the SEL state, and check the electrical limits and coupling network for that input. Observe the clock at a point already driven by the module to see whether it is continuous. A module enable pin and the LMK00105 output enable may both be called “clock enable” on a schematic, but they govern different events. Give each transition its own trace label, especially if one firmware command changes both GPIOs. That lets you assign any extra delay to the right part of the chain.
Why a different trigger phase can change the wait by nearly a cycle
TI states that when OE rises, the LMK00105 starts buffering the input at its second falling edge. Consider a stable 25 MHz clock, with a 40 ns period. If the next falling edge follows OE by 5 ns, the second comes 45 ns after OE. If the next falling edge follows OE by 35 ns, the second comes 75 ns after OE. The difference is 30 ns, with the same 25 MHz crystal in both examples.
A 50 MHz active oscillator has a 20 ns period. If the first falling edge comes 5 ns after OE, the second comes at 25 ns. These are illustrative intervals to the input edges that the data sheet describes. The observed threshold crossing at the output also depends on delay through the selected path, loading, and the measurement threshold. On the bench, record the time from OE to the second input falling edge, then record the output behavior after that edge. A fixed 45 ns acceptance limit for every 25 MHz board would cause false failures as GPIO timing changes phase.
Measure it without loading the crystal node
With a 50 MHz active oscillator, observe the input at the buffer, the buffer’s OE, and one LVCMOS output together. Trigger on OE, check whether the next two falling edges are present at the input, then inspect the first usable waveform at the output. Keep the probe return short and choose the scope input and probe based on the output’s drive conditions. Record the threshold and probe setup so another engineer can distinguish a waveform problem from a different measurement connection.
On the 25 MHz passive-crystal board, a standard probe on the oscillator pin can change its load. Start with OE continuously asserted. Measure the steady frequency at a buffered output and repeat several power cycles to see whether the network starts on that board. Then hold the supply, SEL, and temperature constant and capture the output while cycling OE alone. If the signal at the crystal must be observed, use a characterized low-loading setup and document the additional capacitance. A board driven by an active source can serve as a control if its input is configured per the data sheet and the measurements from the original board are kept separately.
While the output is stopped, check the receiver too. The data sheet’s table lists high impedance for the disabled output, and its timing description includes a low stage during shutdown. A DC reading may be close to ground or may be set by the receiver’s bias network. Inspect the actual components and capture the transition. Preserve separate records for the static level, the turn-off transition, and the amplitude during clocking. If the design requires a defined logic level when the clock stops, test that requirement at the receiver as well.
Write two acceptance criteria into the board work order
For the 25 MHz passive-crystal build, keep the full part specification, load capacitance, ESR, allowed drive, and cold-start results with its matching network. The 50 MHz active-oscillator build needs its own supply, output type, startup time, frequency stability, and enable behavior checks. For each build, record supply, temperature, SEL, OE, test points, first valid output, and steady frequency. When no input edges follow OE, investigate the oscillator, routing, and input selection. When the input is stable and only the waiting time changes with phase, evaluate the buffer’s synchronization behavior. Purchasing can tell from the report whether a replacement passed only a frequency check or also the board’s first-clock acceptance check.
A processor on the same board might leave reset before the clock arrives. An additional capture of the receiver reset can verify the order against its data sheet, over repeated starts at the same temperature and supply. Even when steady-state frequency agrees, firmware that waits on the wrong event can fail intermittently. Retest both cold startup and warm enable when qualifying a new source, and file the two records together.