A MAX3421E board intermittently fails to initialize after changing its 12 MHz crystal. To compare two same-frequency crystals, engineering suggests a quick check of whether USB enumeration succeeds after a fixed 10 ms power-up delay. ADI explains that the internal PLL multiplies 12 MHz by four to generate the internal 48 MHz clock. The OSCOKIRQ bit tells the SPI host that the clock system has stabilized. The substitution test can therefore check crystal operation and distinguish actual readiness from a command issued too early by software.
Mark each observable timing event
Record reset release, first status read, OSCOKIRQ assertion, and the first USB transaction. Repeat startup with the existing and candidate parts on the same board revision, supply, configuration, and software. Capture the distributions. A periodic waveform at the crystal pins does not establish PLL settling. Probing the crystal circuit can itself alter startup, so begin with readable status and buffered signals where possible.
Separate the functional failure from the component specification
If the host starts USB early and the status bit asserts normally later, check firmware wait and timeout behavior. If the flag does not appear within the allowed time, investigate the crystal, loading, supply, and IC settings. Use a bounded wait and retain diagnostic information for failures. Choose the limit against overall startup requirements, without relying on a few fastest observations.
Ask the supplier for the exact configuration of the 12 MHz crystal. The internally generated 48 MHz does not need a separate crystal line in the BOM. Preserve the specification and board-level startup statistics in the incoming-material record. Track the software correction under its own revision so changes to protocol initialization are not mistaken for changes to crystal performance in the next comparison. ADI MAX3421E oscillator and PLL description
