Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Packages and Board Assembly

Reflow soldering for surface-mount crystals: what timing matters besides peak temperature?

The assembly house sends a profile with a peak inside the part’s limit. Read the time axis as well. Check the ramp into preheat, the time in the preheat range, the time above the solder liquidus, and the duration near the peak. Two profiles that reach the same peak can expose the part to very different thermal histories.

Where to place the thermocouple

Choose the measurement point and acceptance criteria from the specification for the exact crystal. Attach the thermocouple to a profiling board with thickness, assembly, and nearby thermal mass representative of production. Record the board ID, its position in the oven, and thermocouple location. Oven-zone setpoints describe the machine settings. The measured profile shows what the part actually experiences.

For double-sided boards, keep the two reflow profiles separate and log any local hot-air rework as a separate operation. Check the allowed number of passes, temperature, and time for the exact model. If startup slows after soldering, compare groups with and without rework and retain pre- and post-soldering frequency and appearance records so manufacturing can review the relevant process step.

Send us a part number or your requirements

Brand, frequency, quantity and delivery target — a useful place to start.

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.