Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / System Validation and Replacement

Miniature crystals: isolating slow startup after a package change

If cold startup slows after reducing crystal package size and changing the routing and both load capacitors, keep the original board as the baseline. Use identical firmware, IC revisions, supplies and cold-start criteria on both boards. Start timing and detect oscillation at the same points. Repeat startup under the same power-off conditions and log every startup time and timeout count.

Use factors you can vary independently

If load capacitance is adjustable on both revisions, start from each board's known setting, change only one capacitor setting and then restore it. Check whether the startup-time distribution changes with the setting and returns when it is restored. If the two packages cannot be fitted to the same footprint, adding an adapter is not a crystal-only change. Its extra pads and stubs change parasitic loading too.

If reducing the load restores startup only on the new board, first check its pads, routing and effective load. If startup remains slow over several capacitor settings, check both crystals' ESR grades and the drive available from the chip. Tie the conclusions to the specific board and part combinations before deciding whether to change the board, capacitors or crystal.

Send us a part number or your requirements

Brand, frequency, quantity and delivery target — a useful place to start.

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.