Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

Comparing crystal quotes with different minimum order and pack quantities

A pilot run needs 1,200 crystals. Suppose supplier A charges CNY 1.00 per part and sells only full reels of 3,000, while supplier B charges CNY 1.50 per part and can cut 1,200. Compare the outlay on the same tax, currency, and freight basis. A costs CNY 3,000 and B costs CNY 1,800. The prices here are illustrative.

Compare both quotes for the same 1,200-part requirement
Purchase termsAmount paidParts left after this run
A, full reelCNY 3,0001,800 pieces
B, cut tapeCNY 1,8000 pieces

How much of the surplus can the project use?

If later purchases are available at B’s assumed price, total spending with B reaches CNY 3,000 after 2,000 parts. Under these simplified assumptions, the two options break even once another 800 parts are used. Further freight, purchase quantities, carrying cost, or stock made obsolete by a redesign can move the break-even point.

Record the purchase quantity, actual usage, intended use for the remainder, packaging, quote validity, and landed cost separately. Verify the full part number and traceability for both suppliers. If approval covers only this pilot run, label any later demand as an assumption so the buyer can see the inventory cost behind the lower unit price.

Send us a part number or your requirements

Brand, frequency, quantity and delivery target — a useful place to start.

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.