Crystal substitution: define retest triggers after first-article approval

After a first article is approved as a substitute, how does purchasing know whether a different temperature grade or output suffix requires retesting? At approval, record the complete original and replacement codes, datasheet revisions, PCB and firmware versions and tested conditions side by side. If standby was never enabled, state explicitly that standby wake-up was not verified.

Write down three specific ways to handle changes

  • If only the quantity per reel changes, purchasing checks the order code, label and traceability. Manufacturing verifies tape feed direction and the placement program.
  • If load capacitance, package or board routing changes, hardware engineering should recheck the footprint, effective load, frequency and startup at the operating limits.
  • If CMOS changes to a differential output, reassess the receiver, voltage, termination and routing. The original single-ended first-article test does not cover the new interface.

For a routine lot change within the same brand, follow approved receiving and traceability checks. If a feature is enabled for the first time or the use temperature exceeds the tested range, refer the difference to the responsible engineer for the relevant tests. Record the triggering field, owner, result and applicable board revisions in the release record so the next approval has a clear basis.

Send us a part number or your requirements

Brand, frequency, quantity and delivery target — a useful place to start.

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.