A “60-second warm-up” for a 10 MHz OCXO needs a frequency reference. Item 2.5 of the Taitien NF-10M-7000 series specification uses the frequency 15 minutes after power-on as its reference and specifies an initial ambient temperature. If the system instead requires the output to be within ±1 Hz of nominal, the acceptance reference is different. Taitien NF-10M-7000 series datasheet
How to read the point of readiness from the curve
Suppose the system allows ±0.1 ppm, or ±1 Hz at 10 MHz, and requires the output to hold within that band for 10 seconds. If it enters at 30 seconds, leaves at 35 seconds and re-enters at 50 seconds without leaving again, the stable interval starts at 50 seconds. There is enough evidence to confirm it at 60 seconds. State which timestamp the report uses.
Set time zero at power-on at the device pins and log the supply and frequency error together. A long counter gate can average out an overshoot, so record the gate duration and timestamp position. For a cold start, record the initial temperature, how long power was off and the frequency reference. Test restarts after brief outages separately while the device is still warm. The system can then determine when this reference is ready to use.
