Once the prototype passes, purchasing needs a record that links the approved sample to the production order code. A sample ticket showing only frequency and size cannot identify the temperature range, supply option, or enable function that was tested.
Make the approval record reproducible
Keep the sample label, sample order code, specification revision, test board ID, and measurement conditions together. For a passive crystal, include key conditions such as load capacitance and ESR. For an oscillator, record supply, output, and the control pin definition. For engineering samples, request written confirmation of the corresponding production order code and any differences.
Use the approved production order code for the first purchase. If packaging quantity changes, confirm the original reel label and tape orientation. If the temperature, load, output, or enable suffix changes, have the engineer determine what the earlier tests cover. At receiving, repeat the affected tests on the same board and archive the results with the first lot’s date code as a reference for reorders.
