A supplier delivers custom-frequency oscillators in two days. The first board boots and the counter shows the target frequency. The production quote then comes back with two numbers, one for a blank field-programmable device and one carrying the complete target configuration. Purchasing needs to establish what will arrive. If one stock record covers both, a blank can reach the placement line or field-programmed engineering samples can be issued against a qualified production lot.
Recover the programming record from the sample bag
The SiTime Time Machine II manual calls field-programmable parts FP devices and requires a blank compatible with the target oscillator family. Entering a valid target part number allows the application to identify the corresponding FP device. The manual also directs users to identify programmed parts as engineering samples and to contact SiTime sales for volume orders. The programming result gives the prototype test a physical basis. Confirm the production order code, delivery state, and acceptance requirements before ordering.
Ask the sample supplier for a packing record that ties together the blank part number and lot, target number, programming date, and job reference. Add a channel or individual sample ID when several sockets are in use. Retain the configuration with the output format, rated voltage, temperature range, stability grade, output-control pin, and drive strength alongside the frequency. Use the bag ID and device test record as the link when the complete target code cannot be read from a top mark. Carry the link into the assembled board record.
A shared target can have different sample histories
Suppose production calls for a 44 MHz, 3.3 V oscillator. Desktop programming software can build an engineering sample for a complete target code. A room-temperature reading of 44 MHz verifies one sample at the supply, load, and measurement conditions used. Production still needs the purchased grade to carry the required supply range, enable logic, and temperature guarantee. A different drive setting can deliver the same count over a cable and change the edge, overshoot, or receiver crossing on the board.
Microchip's DSC6000 materials give another concrete example. Field configuration with TimeFlash writes one-time-programmable memory in a blank DSC6000 device. That characteristic applies to the devices Microchip identifies. Check each family's documents. If stores book a programmed sample as a blank and the setting is later found to be wrong, reprogramming may be unavailable. Mark issues, returns, and scrap transactions as blank, programmed, or awaiting identification.
Check assembly history as well. Loose hand-soldered samples and production reels need distinct incoming packaging records. If prototype testing used an adapter board, record its ID and routing. Check whether the margin carries over to the production assembly. Preserve firmware revisions and settings if the prototype applied firmware correction. Verify output after a power cycle so a host-side setting is not recorded as part of the oscillator’s supplied configuration.
Carry the sample tests into incoming acceptance
Record the tests the samples actually passed. An output at room temperature is a basic functional check. Add tests that distinguish the settings that matter to the design. Examples include supply at its limits, the available enable states, the waveform at the receiver, and a cold start at the device's minimum application temperature. Attach the board revision, voltage measurement point, load, and results to the sample ID. That gives the first production lot a usable baseline even when the target code is shared across programming routes.
Take a sample from the first production shipment and repeat those checks on the same board under the same conditions. Complete the production qualification checks that the prototype did not cover. The engineering record should identify which findings came from field-programmed samples and which came from shipment stock. If output control differs at the same frequency, keep the production batch on inspection hold and reconcile the order code with the shipment label. For a dead output, the bag state and programming record can narrow the issue before the team investigates solder joints and power.
Put delivery state on the PO line
The production line can specify configured devices under the complete manufacturer ordering number in the agreed packaging, with blanks and field-programmed samples identified separately. Include the approved specification revision, quantity, and reel-label requirements. If a contract supplier will program production devices, specify approved blanks, who controls the programming file, first-article approval, whether each device is verified, how failures are segregated, and how completed units are labeled. A small validation order can establish whether the supplier can execute the process.
Field programming gives engineers a quick way to compare frequencies and edges. Give purchasing records enough detail to keep the result usable. Separate development parts from production units in inventory, and place repeat production orders against the record that connects the first official shipment label, configuration, and board results.