Low-power products can disable an external oscillator between measurements. Standby may draw microamperes instead of milliamperes, but restarting requires time for oscillation, a valid output, and the receiver to be ready. Startup current can exceed steady current. For short intervals, repeated starts can cost more charge than leaving the clock running. A bench measurement can identify the break-even time for the actual configuration.
How much off time repays one restart?
Suppose a 3.3 V oscillator uses 2.0 mA running, 12 µA in standby, and an average of 5.0 mA for 3.0 ms after enable. Let T be the total interval from idle entry to the next required valid clock, at least 3.0 ms. Leaving it on uses 2.0 mA × T. Switching uses 0.012 mA × (T−3.0 ms) + 5.0 mA × 3.0 ms. The example breaks even near 7.53 ms, which includes about 4.53 ms actually spent in low-current standby.
At T = 5.0 ms, continuous operation takes 10 µC versus about 15.02 µC for a restart. At T = 20 ms, it takes 40 µC versus about 15.20 µC. At constant 3.3 V, 15.20 µC equals about 50.2 µJ at that supply plane. If voltage droops substantially or converter efficiency varies, capture voltage and current together and integrate instantaneous power at the relevant supply plane.
Define the measurement interval
Use a suitable dynamic current instrument or verified current sensing path. Record enable, local supply, and a clock-valid marker. Determine whether the part only disables its buffer or stops the oscillator core. Measure actual standby current and valid-output delay for the mode in use. Keep voltage, load, temperature, and validity rules fixed. Integrate from idle entry until the receiver can resume. If the receiver takes another 2 ms to lock, include it in the system budget.
Check range switching, minimum resolution, and voltage disturbance. A broad range can obscure standby differences while a sensitive range can clip startup or create more series drop. Use separate suitable ranges on corresponding intervals, or verified seamless ranging. Ensure matched operating states and time alignment. Repeat integration at a different sampling rate and window to check for missed peaks or recharge tails.
Allow for startup variation
If the slowest of repeated starts exceeds 3 ms, firmware must account for more than the mean. Choose lead time that meets recovery requirements at the needed temperature, supply, and loading. Log any corner that needs separate treatment. An early restart can reduce the savings. A late one can miss the next task. Evaluate timing and energy separately.
Finally run both policies against the real task schedule. Compare total charge at the supply while checking missed acquisitions or timeouts. Identify whether measurements were at the oscillator, regulator output, or battery input. They include different loads and losses. Save integration windows, standby current, peaks, recovery times, and voltage traces to reproduce the short-interval and long-term energy results.
Decide whether local capacitor recharge belongs in the measurement. An enable-only change may leave the supply and bypass charge intact. A switched supply can recharge bypass capacitance every cycle. An ideal 1 µF charged from 0 to 3.3 V draws about 3.3 µC. Do not add that again if it is already inside the recorded supply-input integral. Log off-state voltage where discharge or backfeeding could alter the initial state.
Measure representative intervals if the firmware cadence changes. Short intervals may favor continuous operation, medium ones may sit near break-even, and long ones can show savings. Battery life still depends on other loads and converter efficiency. A measured 25 µC saving at the oscillator supply is a branch result, not a complete battery-life percentage.
