On a low-power board, the 25 MHz active oscillator remains powered in an always-on domain while the controller’s clock-input domain is off. The controller has a fraction of a volt on its supply pin, and part of the oscillator waveform is clipped after shutdown. Separate the source, isolator and receiver power domains, then examine input current with power off. A software shutdown indication does not establish whether the clock pin is back-powering the controller.
Draw the current path as well as the logic
The clock high level can exceed the unpowered receiver supply. If the input has a clamp path to that rail, the high state can inject current into the switched-off domain. Strong clamping can also disturb the source waveform and affect other active receivers. The TI SCDA015 demonstration includes a 3.3 V AC clock driven into an unpowered signal switch. A switch without powered-off protection back-powers and unintentionally passes the signal, while a protected switch maintains isolation. This illustrates one possible path. Check the actual pin on the controller, clock buffer or module.
The receiver rail may also have a discharge resistor, a disabled regulator output and other inputs. Its measured residual voltage depends on injection and those paths. Suppose 0.5 mA of net injection charges only a 10 µF rail capacitor. The ideal initial rise is I/C = 0.05 V/ms, or about 1 V in 20 ms if the current persists. Actual behaviour also depends on the clamp, parallel loads and effective capacitance. A high-impedance meter showing 0.7 V cannot identify the clamp path or infer the current by itself. Capture the rail, clock edge and current together.
Separate power-off leakage, powered high impedance and the ramp
The SN74LVC1G125 data sheet, for example, specifies Ioff of ±10 µA at VCC = 0 V with the specified input or output at 5.5 V. Keep the test voltage and supply state with the limit. Leakage of a high-impedance output disabled by OE during normal power has a different entry. It cannot qualify a clock path through an unpowered buffer. Even if leakage at zero volts passes, check the manufacturer’s conditions and actual board behaviour while the supply ramps from one volt to two.
If adding this type of buffer before an unpowered receiver, check that the buffer follows the receiver power domain. Verify that OE pull resistors and control signals create no new back-power path. The peak input, edge and output load must also meet operating limits. If the receiver needs a clock before power-up, verify the pin is specified for that condition. Otherwise sequence clock enable and ensure valid cycles are present before controller reset release. Check every output branch of a distribution board. Changing one branch can leave other off-state receivers connected to the same clock.
What the resistor calculation can establish
Assume an illustrative clamp with about 0.5 V forward drop and its rail held at 0 V. For a 3.3 V high and an initial current target below 0.2 mA, the simplified model needs R ≥ (3.3 − 0.5)/0.0002 = 14 kΩ. The 0.2 mA is an example target, not an allowed current for an actual part. With 8 pF total input capacitance, a 14 kΩ first-order network has 10%–90% rise time of about 2.2RC ≈ 246 ns, far longer than a 25 MHz period of 40 ns. Reducing the resistor can improve the waveform while increasing injection. Meeting a current limit also may not hold the rail in its intended state. A DC calculation alone cannot qualify a high-speed clock.
Record power and clock in the same acceptance measurement
- Use actual sequences within manufacturer limits. Start with both domains powered, then test the source on and receiver off, the receiver powering first, and restart after shutdown. Record active discharge, instrument grounds, meter burden and probe capacitance. A disabled bench supply may not sink injected current. Establish its effect on the switched rail.
- Capture receiver supply, clock input and reset together. Capture switching peaks and decay immediately after shutdown and measure settled leakage separately. Where the board has a disconnectable test path, compare rail voltage and current with the path connected and isolated under the specified conditions. Isolate debug leads, pull-ups and other possible current sources. Check that the oscillator output meets limits under nominal load.
- At restart, qualify the first valid clock edges before reset release. Check amplitude, threshold and minimum high and low intervals as well as clock presence. For an anomaly limited to the middle of a ramp, record the relevant supply range and waveform. A passing zero-volt leakage test does not describe the whole transition.
Set the current limit from the system budget. If the clock path adds a measured 0.12 mA while the secondary domain is off for 20 hours per day, it costs 2.4 mAh/day. Compare that with the product's allocated standby charge. This is more informative than a rail reading of several hundred millivolts by itself. For standby currents of a few microamperes, check range switching and meter burden so the instrument does not alter rail voltage. Measure device leakage with the supply held at zero separately from behaviour on a floating system rail. Unexpected voltage on the latter also belongs in reset and restart qualification.
A three-state output can float while the buffer is off. If the receiver needs a fixed idle level, specify the pull network and actual loading. A pull-up on a still-powered rail can create another route around the isolation. Qualify the real domains, termination and cabling. Removing the clock lead and seeing the residual voltage disappear is an initial diagnostic.
For substitution, record the oscillator and isolator order codes, tested pins, permitted off-state high level, Ioff conditions, residual rail and recovery limits, and the controller application conditions. If the oscillator is healthy but the controller powers up incorrectly, the record can distinguish the source power domain, receiver clamp and another interface still feeding current during shutdown.