A team buys a self-learning Rakon ROD2522S2H for a 10 MHz OCXO position that requires 24-hour holdover. On the first bench power-up, the oscillator starts producing a waveform. The lab removes the external pulse-per-second input and starts a timer. That test lacks the prescribed operating and learning history. The record describes that startup but cannot establish the published holdover result. Separate ordinary incoming checks from the longer qualification run. Reserve an instrument, a valid reference source, and test space. Work out how many specimens can run in parallel and how much time a rerun would add before promising a completion date.
The presence of a 10 MHz waveform identifies just one part of the sequence
The Rakon specification distinguishes power-on, free-run, learning, and holdover. The OCXO can generate its clock in free-run before it has learned its ageing characteristics. A valid 1 PPS input enables learning. The published compensation duration is up to half the learning time, capped at 24 hours. The specified holdover stability also requires three days of continuous operation after initial power-on. Twelve hours of valid learning therefore covers up to six hours under the learning rule, subject to the separate initial operating requirement. A 24-hour target takes at least 48 hours of learning. Confirm whether both requirements can be met within the same continuous run and retain a record of each operating state.
A test station can be booked on that basis. One plan provides a valid reference from the first morning, observes entry into learning, and runs the device continuously for 72 hours with at least 48 hours of valid learning. It then observes 24 hours of holdover. Assuming any post-assembly prerequisites have already been met and that overlap is permitted under the test plan, the run occupies at least 96 hours. Three daytime shifts of eight hours each provide only 24 hours of operation and do not satisfy the continuous requirement. If power work interrupts the lab or the reference goes invalid, record the start, end, and device state. Reassess the data against the manufacturer conditions and allow time for a new run if needed.
Verify the reference at the device and interrupt only that input
The learning table specifies an HCMOS pulse input with a low of no more than 1.0 V, a high of at least 2.2 V and no higher than the supply, and a width of 10 to 10,000 µs. A fixture set to 1.8 V high falls 0.4 V short even if its 100 µs pulse meets the width requirement. Check amplitude and width at the oscillator pin. Record the source timebase, cabling, and any board-level translation. If the device remains in free-run, confirm when the reference actually reached the input before investigating how software reads the state. A host indicator that the source is enabled does not establish entry into learning.
To start the holdover run, disconnect the pulse input while continuing to power the 10 MHz OCXO. Record frequency and phase at the interruption, use the approved measurement points, and retain the temperature trace. The manufacturer table associates 24 hours with 1.5 µs under zero initial frequency and phase error, symmetrical 4 °C variation, and a 0.5 °C per minute ramp. Record how the setup aligns the initial state. Keep the temperature setting and nearby sensor reading. A mission involving wider excursions, repeated reference losses, or a known starting offset needs a corresponding system test. In holdover, measure time error relative to the specified reference. A present and stable-looking frequency output alone cannot establish integrated phase performance.
Make each fixture action traceable. If a single pulse source goes to the oscillator and the time-interval instrument, switch off only the oscillator branch and preserve the measurement reference. Record the switch command and last valid pulse so an anomalous trace can be attributed to the device or to the chosen trigger time. If the normal reference at the instrument is lost too, document whether it moved to a continuous, independently compared reference. A gap in the status log cannot simply be credited as learning. Reconfirm the device state and reference before calculating the usable learning duration.
When several boards run in parallel, give each specimen its own observation channel and serial-number record. Report a shared chamber outage against every affected board. If only one reference cable comes loose, reschedule that specimen using its own record. A completed holdover run for one board cannot stand in for another.
Define what receiving and long qualification each approve
Order the ROD2522S2H with the manufacturer-confirmed code for the 10 MHz output and specify the applicable data-sheet revision. Define acceptance scope for the work order. Receiving can verify label, lot, and specimen identity. Bench checks can cover supply, RF output, and entry into learning with a valid input. A 24-hour qualification record should add effective learning time, continuous power, reference-loss timing, temperature, and phase data. When two suppliers quote the same family, ask what evidence they can associate with the delivered lots and which checks the project must run. A factory room-temperature frequency report or a short startup trace can support basic electrical acceptance. Approval for holdover waits for evidence under the corresponding conditions.