One oscillator failed incoming inspection. Can a fresh sample release the lot?

Incoming inspection finds a frequency failure. The supplier suggests drawing the same number of units again and accepting the delivery if they all pass. First confirm that the original measurement was valid. Then check whether the agreed plan was single sampling or a defined double-sampling plan. If the first result was valid, use the established lot disposition. A supplier sort can be evaluated separately. Record the original finding and what the supplier did, then link a resubmission to the source lot. Simply drawing a new sample can erase a real defect from the report.

The NIST explanation of lot acceptance distinguishes single and double sampling. A predefined double plan calls for a second draw when the first result is in the continuation range, and uses the cumulative result. ISO 2859-1 is one standard for lot-by-lot attribute sampling, with the applicable version and plan agreed by both parties. Whatever contract applies, distinguish release under a sampling plan from correcting a bad measurement after an instrument fault.

Keep the failed part in its own labeled package

Record the part number, reel, sample position, instrument, conditions, photographs, and raw data. Check the original program, units, device supply, and output state. Use a verified control, and if needed have another operator repeat the test under the same conditions. Near a limit, apply the existing uncertainty or retest rule. Repeated insertion or a program change can alter the result. Log actual changes.

For example, a disconnected timebase or a test on the wrong output pin may invalidate the first measurement. Record objective evidence and obtain designated approval to correct the inspection. Check other lots measured with the same equipment fault. When the original result is valid and fails the rule, keep the lot on hold until quality and the supplier decide the disposition. A pass on a different part establishes that the instrument can work, but it cannot erase the first observation. Record every change of condition during a comparison.

Worked example for single and double sampling

Suppose an internal agreement calls for 40 random parts per lot and accepts at zero failures. One device in lot A is outside the frequency window, and a verified program confirms it. Lot A cannot pass that rule. An additional 40 good devices shows only that there were no failures in that additional sample. The supplier can screen an agreed suspect population or the entire lot under an approved method, count rejects, and resubmit under a traceable shipment ID. Inspect another lot B by its own lot number even if it shares an outer box, unless the two reels are part of one indistinguishable lot.

Now assume another device has a predefined double-sampling plan. In this illustrative example, the first 40 are accepted at zero defects and rejected at two or more. Only one defect triggers a second draw of 40. The two samples are then combined and accepted at no more than one defect. One followed by zero passes. One followed by one totals two and fails. Two in the first draw ends the process. Set the thresholds and the random drawing method before receipt.

If the sampling sheet treats a reel with one ordering code as one lot, check the factory production identification. Where a reel contains two lots with an uncertain boundary, quality can agree on a common conservative risk scope while asking the manufacturer for traceability. If an inner box contains several unrelated lots, a good sample from one does not establish coverage for all. Separate lot acceptance may increase controlled inspection, but it helps isolate a later problem to the right packages.

Book a sorted delivery as a traceable resubmission

Request the source lot, start and end dates, verified screening settings, before and after counts, rejects, and package IDs. Test a known bad device to confirm the screening station detects the original issue. Preserve child-package links if sorted stock is re-reeled and keep it separate from unsorted remnants. Cross-reference the first inspection, internal repeat, supplier screen, and new receipt. Preserve the original defect and the final disposition, distinguishing a rejected lot from the quantity physically removed.

If a small pilot is urgent, quality and the project owner can consider a concession for specified reels, quantities, and uses. Perform any required additional tests and leave the remaining material under the initial hold. Check that automated issue sees only the approved quantity and that the placement trail links back to the lot. Retain an original failed specimen when the supplier retrieves the lot for sorting. If labels change, reconcile the original lot and the resubmitted count together.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.