A return bag contains two kinds of 32 kHz timing parts. One operator checks resistance and connects a scope across a device, sees no output, and proposes rejecting the lot. Identify whether the item is a two-terminal quartz resonator or a powered oscillator with a clock output. They have different test nodes, loads, and permitted excitation. An incorrect fixture can reject good material and change the condition of a returned sample.
Identify each set of inspection conditions
Epson FC-135 Q13FC13500004xx is a 32.768 kHz passive crystal. The item specification gives 12.5 pF nominal load, 70 kΩ maximum ESR, and ±20 ppm initial tolerance at +25 °C and the specified drive. The drawing shows two resonator terminals. A scope connected to a loose crystal does not complete an oscillator circuit. A continuity meter does not establish its AC properties. Confirm the ordering number and route it to an approved crystal analyzer or representative fixture with the specified loading and excitation.
Abracon ASDK is a 32.768 kHz active oscillator family with supply options, output, and load specifications. Read the full ordering suffix, power it correctly, and establish control-pin and default output behavior. A fixture wired only across two pads can miss the clock entirely. Ask for exact part and pin drawing when a quote only says 32K SMD. Select the test path by electrical function, even if the packages look similar.
Control drive and load for the passive part
The cited FC-135 specifies 0.5 µW maximum drive and uses 0.1 µW for its room-temperature frequency tolerance condition. Have the lab select excitation under the approved method. A simplified loss calculation gives a sense of scale. At an assumed 70 kΩ motional resistance, 0.1 µW corresponds to about 1.20 µA RMS motional current. This illustrates the specification and is not a fixture setting. Actual analyzer setup depends on the device model, instrument definitions, and calibration.
Run a verified reference unit first. Check load, contacts, and environment. On an RTC board, use a documented clock output or another approved low-loading method. Probe capacitance can be comparable to the crystal load and affect frequency or startup. If the parts pass the fixture test and several boards fail to start, investigate oscillator drive, layout contamination, effective load, and assembly before assigning the failure to the incoming lot.
Verify active clock operation under its actual conditions
Confirm supply and startup time. Capture high and low levels, swing, continuity, and actual output load. If there is no waveform, retain the label and fixture settings and check voltage at the pin, the control state, and possible output clamping. Hold power, cable, and scope channel constant when comparing parts. After observing a normal room-temperature frequency, add any required backup supply, stop-and-restart, and temperature tests. A clock present in one mode does not establish the required transitions.
At 32.768 kHz, ±20 ppm is about ±0.65536 Hz. The example window is 32767.34464 to 32768.65536 Hz. A kHz display to three decimal places has a 1 Hz increment, which can hide a decision boundary. Confirm counter timebase, acquisition interval, and display resolution on a stable reference, and save raw readings with conditions. A passive test still requires the stated load and drive. An active part uses its own accuracy definition and operating conditions.
Identify whether a customer returned a loose device or a populated assembly. If the clock only disappears in operation, capture power and clock transitions before removing parts. Compare with a known-good board and retain an intact example for the supplier. A passing component test does not close the field issue. Recover battery voltage, outage history, and conditions before reproducing it.
If the station only offers a pass light, have quality set up distinct programs using known-good examples. Verify which part each accepts, where frequency is read, and where supply or drive is checked. Record fixture, counter channel, cable, and load. A replacement socket or buffer calls for a verified decision threshold. Approve routine receiving only after the applicable setup is identified.
Make the return reproducible
Use separate receiving checks for passive and active devices. Record specimen, complete ordering number, result, allowed conditions, and equipment. For a no-clock result, retain untested examples from the same lot. A return can identify the samples and production orders. Save the original observation along with a retest under the correct method. If frequency, startup, or current actually fails, send the supplier the applicable requirement, test conditions, value, and waveform. Purchasing can then decide which quantities to hold or release and repeat the same test on replacement material.