Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

Ordering a Taitien NF-10M-7000 10 MHz OCXO for a board that goes through reflow

Purchasing receives a Taitien NF-10M-7000 10 MHz OCXO sample and engineering hand solders it. The sample works. The prospective volume contractor only runs automatic assembly and proposes printing paste in the through holes and reflowing the entire board. Check the soldering section of the exact specification first. Taitien’s public NF-10M-7000 data sheet specifies hand soldering and a temperature and time condition at the leads. A working sample confirms that this assembled unit can be measured. It cannot establish that heating the entire sealed package and heater in a reflow oven preserves the component’s performance.

Put the soldering restriction in the assembly order

Taitien’s product page lists the NF-10M-7000 as a 3.3 V, 10 MHz through-hole OCXO. Use its data sheet outline for dimensions and pin locations. Section 7.6 permits hand soldering, prohibits reflow, and gives a condition of 260 °C for 10 seconds at the leads. Ask the assembler whether the oscillator can be installed at a separate station after reflow. Put the restriction on the assembly drawing or contract manufacturing order so the production team receives it as well as procurement. For soldering and rework plans outside the published conditions, give the supplier the planned process and thermal cycles and obtain written boundaries.

Record lead temperature and soldering iron setpoint separately. A display reading of 260 °C does not establish lead temperature. The board draws heat away and the tip and joint can sit at different temperatures. At pilot, record the iron setting, contact method, measured lead position, and duration and compare them against the manufacturer condition. If someone proposes a brief pass through an oven, record that profile separately. Heating a whole package is different from local lead contact. Even if a lead stays near 260 °C for only three seconds, the package and board can heat for much longer. Reflow requires separate manufacturer support.

Include hand soldering in pilot time and process order

Suppose a 200-board pilot uses one 10 MHz OCXO per board. The contractor measures 75 seconds per board for scanning, inserting, hand soldering, and initial inspection. The station needs 15,000 seconds, or 4 hours and 10 minutes. Allowing 10% additional station time for first-article checks and intermediate verifications brings it to 4 hours and 35 minutes. If only four hours are scheduled, the shortfall is 35 minutes. Ask the assembler to quote a separate lot, more station time, or parallel workstations. This makes the cost and turnaround visible and helps avoid an unapproved change to the reflow process after the line starts.

Where the board also has underside reflow or rework heating, install the oscillator after scheduled high-temperature steps. Have manufacturing measure thermal exposure from repairs to nearby parts. For example, if a neighboring connector needs a hot repair after production, the rework instructions should say whether to remove the OCXO first, how to identify it, and whether reuse is allowed. The published ten-second condition does not establish an allowed count of repeated heating cycles. Reuse depends on the qualified process and agreed supplier conditions. Keep new parts separate from parts removed from boards for failure analysis.

Use different test histories for rework and new units. In a traceable pilot, retain hand-soldered samples and unsoldered controls. Establish an individual baseline before sending selected hand-soldered units to the chamber. For example, assign twelve parts as four unsoldered controls, six normal hand-soldered units, and two units for an approved nearby-rework simulation. The groups have different thermal histories and need separate results. If one shows an anomaly, preserve the devices and room-temperature readings, then check process differences and measurement repeatability before holding the remaining boards from that operation. Record the assembly station, soldering or temperature record, and original device lot. This gives a new contractor a way to demonstrate that it can observe the same restriction.

Keep two comparable frequency readings before and after soldering

At first article, use an approved socket fixture to take a presolder reading, retaining frequency, output format, supply, and load. Repeat after soldering with the same supply, control voltage, and agreed load. The public data sheet lists CMOS output and a 10 kΩ parallel 15 pF load. A direct 50 Ω instrument input changes the load, so verify the method before comparing readings. Initial accuracy of ±0.2 ppm translates to ±2 Hz at 10 MHz, with conditions including 30 minutes after power-up and 1.4 V control. Agree on board-level acceptance conditions separately where the board supply, load, measurement point, or instrument differs from the factory fixture.

Suppose one 10 MHz OCXO reads 0.8 Hz above nominal before soldering and 1.4 Hz high afterward. The 0.6 Hz change is 60 ppb. Both absolute readings are within ±2 Hz. If the board purchase agreement also sets a 0.5 Hz maximum shift from soldering, retest and assess the change against that clause. With only an agreed absolute accuracy limit, keep the shift as process data. Retain the manufacturer specification, soldering state, fixture settings, and first-article results with the release. If the assembler can only reflow the complete board, qualify a candidate with explicit reflow approval and check pinout and clock performance before placing a production order.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.