Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

Receiving a Taitien NI-10M-3600 10 MHz OCXO more than 90 days after its date code

A quote for a Taitien double-oven oscillator gives only NI-10M-3600. Engineering is interested in its stability for a continuously operating project. Receiving notices that the proposed lot’s date code is more than three months old. The oscillator can produce 10 MHz and the lab can compare it over time, but the manufacturer gives specific conditions for initial accuracy. To decide whether the lot can be used, obtain the exact ordering code, record how the date is interpreted, and agree how to qualify units outside the published window.

Ninety days is a condition on initial accuracy

The output section of the NI-10M-3600 series specification gives initial accuracy of ±0.1 ppm. Conditions include 25 ±1 °C, 30 ±5 minutes after power-up, no more than 90 days from the date code, and the tuning input at the center voltage within ±1 mV. That is ±1 Hz at 10 MHz. Write the conditions into the buying attachment or obtain a supplier agreement for a different criterion. The output specification also lists a 15 pF load, which the fixture needs to reproduce. Keeping a unit on for two hours does not restore the date condition for stock older than the window.

For an illustrative receiving record, suppose the agreed date was August 1. October 25 is 85 elapsed days later, and November 15 is 106 days later. Testing on the first date can fall within the window. Under the same interpretation, the second date is 16 days beyond it. If the date code provides a year and week, the choice of the day within that week can affect borderline results. Request the supplier’s code explanation and the agreed calculation rule. Keep the date code, customs date, dispatch date, and receipt date in separate fields. If waiting for the lab might cross the 90-day boundary, clarify whether the agreement uses receipt or the actual measurement date.

Find the stability and aging combination in Table 1

The series data sheet pairs temperature and aging performance in Table 1 to assign distinct model codes. For −40 to +85 °C, the ±0.2 ppb row lists NI-10M-3610, 3611, and 3612 against different daily, annual, and ten-year aging figures. The NI-10M-3610 column provides ±0.05 ppb daily, ±10 ppb annually, and ±50 ppb over ten years. The daily specification applies after 30 days. The public product summary and the ordering table present different levels of detail and can be updated at different times. Base the order on the exact matrix entry and record the controlled document revision.

At 10 MHz, 0.2 ppb temperature stability is 0.002 Hz and 10 ppb annual aging is 0.1 Hz. These terms have different reference conditions and measurement intervals. Suppose the project reserves 0.08 Hz for both over the first year after calibration. The annual aging term alone exceeds the allocation. Ask engineering whether scheduled recalibration fits the system requirement, or ask whether the supplier can document a tighter limit. Carry the ±1 Hz initial accuracy in a separate row for the untrimmed state. Multiplying the daily figure by a number of days does not establish an initial accuracy guarantee beyond 90 days.

Agree on a separate retest decision for older material

Suppose a 10 MHz OCXO arrives outside the date window and measures 0.7 Hz high at 25 °C after 30 minutes with the specified load and center voltage. If the buyer and supplier agreed to a ±1 Hz retest for this lot before assembly, use that supplemental condition and retain measurement uncertainty. Without the separate rule, the result still informs engineering but does not satisfy the original date condition. Incoming quality can verify the full ordering code, lot or repacking traceability, previous calibration evidence, and the applicable date before choosing further sampling, recalibration, or a documentation hold.

Plan the window for each delivery. Suppose the contract allows inspection up to 20 days after receipt. A lot received 85 days from its date code could be measured on day 105 if the full interval is used. The original 90-day condition leaves five days for testing. Earlier lab scheduling, an agreed ship window, or a written late-inspection clause can resolve the mismatch. For split deliveries, verify the date codes and bench schedule independently. If the supplier provides passing data before dispatch, establish whether that supports the supplier’s shipment release or also replaces the buyer’s incoming test under the contract. When the buyer accepts the preshipment report in place of incoming inspection, retain the original instrument conditions and device serial numbers to preserve traceability when deliveries overlap.

If an operator adjusted the tuning control during retest, keep both the reading before adjustment and the reading after returning to the specified setting against the same sample. If the board uses a DAC for center voltage, have metrology confirm that the setting and measurement resolution can control it within ±1 mV before deciding that the oscillator is out of range. The release record should identify the variant, date interpretation, initial accuracy conditions, and evidence for long-term performance. If a quote changes the aging grade or gives only the series name, send those fields through the change review before treating the parts as substitutes.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.