A shipment of stocked TCXOs arrives eight months after the date on its reel. Incoming room-temperature readings pass. The equipment still needs an aging allowance for its next year of operation. Subtracting the eight months from the allowance treats the manufacturing date as the reference point of the manufacturer's aging test. Find the specified operating conditions and the reading used as the baseline before making that decision.
Page 4 of the SiTime SiT5347 Rev 1.02 datasheet gives separate examples. Its one-day aging entry at 85 °C follows thirty days of continuous operation and is referenced to day 31. Its one-year entry at 85 °C follows two days of operation and is referenced to day 3. A different grade has its own conditions on page 5. Check the exact grade. The figures represent change in frequency relative to the defined baseline. A date code helps trace the lot but cannot supply a missing frequency reading.
Compute three different quantities from the same record
Assume a nominal 100 MHz clock. Its initial installed reading after reflow is 100,000,006 Hz, its reading at the defined conditioned baseline is 100,000,009 Hz, and its later reading is 100,000,014 Hz. The final absolute error is +14 Hz, or +0.14 ppm. The change from the conditioned baseline is +5 Hz, or about +0.05 ppm. The change from the first installed reading is +8 Hz, or about +0.08 ppm. These hypothetical numbers answer three different questions. Choose the reference based on the requirement.
Keep supply, output load, and temperature comparable. At 100 MHz, 0.05 ppm is only 5 Hz. A change in instrument reference can be comparable. Retain serial number, raw readings, timebase, and environmental condition. Note power interruptions and repairs. For a tunable part, say whether the output includes correction or was observed at a fixed control setting. A known stable control sample can help isolate a change in the measurement setup.
Separate stock history from continuous operation
The production week, receiving date, first powered operation, end of conditioning, and final system calibration can fall in different months. Before comparing two batches, collect what is known about storage and arrange the same assembly and test conditions for both. Comparing a just-reflowed unit with one that has been powered for a long time gives little support for a conclusion about aging. A stocked unit that meets a room-temperature limit still requires evidence for the new equipment conditions.
When two lots have different storage histories, record several consecutive observations under the same powered condition. Keep the trend even if the first readings passed. The storage records help define the comparison groups, and the observed drift helps assess the assembled product.
Ask the supplier which documentation governs the exact grade, what powered conditioning and temperature define its aging measurement, and whether its evidence covers the actual storage and assembly history. Mark typical or family-level data accordingly. Manufacturing age alone does not determine how many ppm are left, and an incoming frequency reading does not establish the lifetime guarantee. A decision on margin can use the guaranteed limits, service plan, and engineering evidence.
Connect the first test and the next calibration
A useful receiving record contains date, lot, complete configuration, and purpose. Qualification records also retain how the baseline was established, the raw readings, the two test environments, and powered or unpowered intervals. If the board adjusts its clock, add the available correction in both directions for maintenance. Check whether prior evidence transfers to the new operating conditions. Until there is evidence for a shorter allowance, retain the complete specified aging margin in the equipment budget.