A repair bill of materials still lists a TXC 9C 20 MHz passive crystal. The substitute quote offers QST QT49S and points to a production transfer. A public TXC catalog does map the series. Use the mapping to locate the relevant documents. Approval for the old footprint and circuit depends on the complete specifications of both orders. If the board budget depends on ±3 ppm annual aging, check the QST drawing alongside the original part before signing. Establish which requirements need written supplier coverage and which need board verification.
Map the transfer to actual order fields
Both the basic and high-accuracy lists point from 9C to QT49S. The TXC 9C sheet lists 3.2 to 90 MHz, 18 pF or specified load, and a 30 Ω limit for the fundamental band containing 20 MHz. QST lists the corresponding broad range and 30 Ω at 20 MHz fundamental. Its code J means 18 pF, A means ±30 ppm initial tolerance, and H means ±30 ppm over −40 to +85 °C. Position determines each letter's meaning. Ask QST to confirm the 20 MHz combination and full order code. The table explains the fields while the actual shipment requires the manufacturer-confirmed configuration.
If the old record has lost its suffix, use the approved drawing and board list to recover its load, room-temperature grade, and operating requirements. The TXC sheet gives ±30 ppm over −20 to +70 °C or as specified, while a separate operating range reaches −40 to +85 °C. Check both conditions before carrying them over. A successful test on an earlier sample can support that board's history. It does not establish broader coverage for a new purchase. Do not add an unapproved temperature range to the substitution record while evidence is still pending.
Translate the aging difference into an annual allocation
TXC gives ±3 ppm per year at 25 °C on the old 9C sheet. The public QT49S sheet gives ±5 ppm in the first year at 25 °C ±3 °C. Confirm the original purchase uses the corresponding annual conditions and convert both values to hertz. At 20 MHz, 1 ppm is 20 Hz. The two limits correspond to 60 and 100 Hz, a difference of 40 Hz. If the device allocation is 80 Hz for first-year aging, the first limit leaves 20 Hz and the second exceeds the allocation by 20 Hz. Matching frequency and resistance do not establish compliance with the aging budget. Request a tighter applicable guarantee or have engineering reconsider the system budget and any correction.
A room-temperature spot check can verify frequency. Establish when to measure a newly soldered specimen under the project procedure, then record the board revision, actual material, time, and conditions. Later comparisons need a common baseline. A factory reading and a board's corrected frequency are different evidence. When communicating the substitution, state the guarantee and first article supporting the result so the release scope remains clear.
Request three pieces of information in the change response. Identify the published old-to-new series relationship, the complete quoted code and drawing, and any documented process or inspection differences. Where a drawing lacks the required wording, confirm the part mapping before drawing conclusions. If the original contract requires customer approval of the manufacturer identification, submit the new label and delivery evidence for that approval. A successful startup test serves a different purpose from contractual approval of the material.
When stocking the new 20 MHz repair part, update the permitted board revisions. If the original item was common to two revisions and only one accepts the new aging allowance, limit the new number to that approved work order. Preserve a qualified source for the other revision.
Link manufacturing approval and the stock change
Both are metal-can surface-mount families. Compare the solder terminals, board lands, and permitted assembled height. The QST drawing gives 3.8 ±0.3 mm for SMD height, or 4.1 mm maximum. A hypothetical 4.0 mm minimum enclosure clearance falls 0.1 mm short even before assembly and board deflection. Obtain the applicable drawing and confirm clearance under the project limits. If reel configuration changes, verify the production feeder. Retain new manufacturer labels and lots without overwriting the history of the original TXC material.
Attach the source documents, both exact codes, board revisions, and individual error allocations to the substitution request. A candidate with insufficient documented aging margin can be received for limited engineering evaluation while the supplier reviews the missing condition. After evidence and first article are approved, release QT49S under its own material identity and applicable boards. Existing TXC stock retains its own approved use. A service investigation can then trace each actual board to its installed device and review the proper procurement and assembly evidence.