A ZED-F9T is already in a valid fixed-site timing state. A technician replaces part of the antenna cable and routes the pulse per second to a more distant cabinet. The cabinet input edge now arrives late relative to the reference. The receiver offers both antenna cable delay and user delay. Entering the same positive number in both can reduce one timing error and worsen the other. Mark two reference planes first, the receiver RF input and the edge detected by the equipment that uses the 1PPS.
A positive number has opposite effects in the two fields
Section 3.10.2.5 of the u-blox ZED-F9T integration manual, UBX-21040375 R04 defines antenna cable delay before the receiver input, including RF components such as the antenna, coax and splitter. A positive value compensates for transit delay and advances the time pulse. Because this setting affects the receiver’s calculation of GNSS time, save the original configuration and calibrated test conditions. User delay acts on the pulse position of a particular TP output. A positive value retards the pulse relative to GNSS time and a negative value advances it. To align a receiver-side output whose edge is delayed by the downstream cable, use the measured delay at the user endpoint and apply the corresponding negative adjustment on that TP output.
This sign convention is documented in R04. Record the module and firmware, and check the applicable field definition, units and TP1 or TP2 selection. Confirm the time basis at both ends, the UTC realisation or GNSS time used, pulse polarity and validity state. The first rising edge the instrument detects may not be the configured second-aligned edge. Read back the configuration after adjustment, then recapture the waveform and offset at the target input. Successful configuration storage does not replace a timing measurement.
Calculate the two paths separately
| Example path | Condition | Estimated one-way delay | Compensation direction |
|---|---|---|---|
| Antenna to receiver RF input | 20 m, velocity factor 0.80 | 83.4 ns | Positive antenna delay for this path |
| TP1 to the customer equipment input | 5 m, velocity factor 0.66 | 25.3 ns | Negative TP1 user delay to advance the downstream edge |
For a uniform cable, a first estimate is t = length/(speed of light × velocity factor), using approximately 3 × 108 m/s for the speed of light. The table illustrates the sign convention and does not calibrate a system. The RF path can include delay in amplifiers, filters and splitters. On the pulse path, receiver thresholds, transceivers, adapter boards and distribution amplifiers change when the edge is detected. If the purchase tolerance applies at the cabinet input, measure the whole path at that input or an equivalent traceable reference plane. A cable-length estimate can initialise the setting. Retain the calibrated result.
For example, suppose the antenna path is already calibrated and the TP1 connector edge is close to the local reference, but the measured customer input is 31 ns late. If the path configuration permits it, applying −31 ns user delay to TP1 advances that output by 31 ns. Read back the setting and measure the residual at the customer input. Changing TP2 instead, or correcting a cable already included in the full-path calibration, can give the wrong compensation. State which path each correction covers in the field record. Receiver settings, distributor settings and post-processing should account for each segment only once.
Distinguish the test leads from the distribution path
Call the device pulse A and the reference pulse B. Let a time interval instrument report channel-one time minus channel-two time, with sign retained. Connect A to channel one and B to channel two first and read +32 ns. Swap only the sources at the same reference plane, keeping the instrument’s channel leads, thresholds, terminations and cables fixed, and read −18 ns. With suitable waveforms, limited drift and nearly constant channel skew, the true difference is [32 − (−18)]/2 = 25 ns and the measurement chain offset is [32 + (−18)]/2 = 7 ns. If the measurements are too far apart or swapping changes loading or triggering, check the setup with one stable pulse split into both channels and repeat the comparison. This gives a relative time difference. Absolute offset also requires an independent traceable time reference.
For second-by-second residuals, use the ZED-F9T manual to check the output quantisation error in UBX-TIM-TP. In the manual's 1 Hz example, this message refers to the next pulse, which can differ from the epoch in a navigation message. Match by time basis and epoch, then verify the field, sign and valid conditions for the installed firmware. Applying the previous second’s correction to the present edge adds variation to the adjusted series. Keep the raw pulse timestamps, pairing record and correction version so another analysis can reproduce the results.
Specify the reference plane for replacement hardware
For a field retest, keep the rest of the installation fixed and replace only a measured cable of the applicable type. If adding an antenna segment with about 10 ns of one-way delay, first check for a repeatable change at the user endpoint with the old setting, then increase the antenna correction and verify that the residual returns to its previous range. For the user side, keep the antenna configuration fixed, replace only the output cable and detect the pulse at its destination again. If a particular installation allows only 10 ns of residual, include the reference, delay characterisation and interval instrument capability in the decision. If one instantaneous result is 9 ns and the setup varies by several nanoseconds, aggregate readings using the agreed method and report uncertainty.
For an order with a defined time offset limit, the acceptance record can identify the cabinet input connector, threshold, polarity, time basis, termination, reference source, environment and permitted residual. Keep the antenna configuration, output user delay and measurement-chain offset as separate records. After reading back the settings, verify the settled bias and variation with the actual cables. NIST’s study of local timing distribution likewise calibrates the delay to individual links against a UTC(NIST) reference point. When an antenna cable, PPS cable or distribution port is replaced, verify the path that changed. This avoids copying a set of corrections calibrated for the old cabinet into a new route.