Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

Three oscillator failures: should DPPM be divided by parts received or parts used?

At a supplier review, the buyer reports three boards that failed to start. The receiving system shows 100,000 parts delivered during the month, the placement history shows 20,000 used, and service is handling returns from earlier shipments. All three numbers may be accurate for different populations. To report defective parts per million (DPPM), line up the numerator and denominator by population or lot, defect definition, and observation window. Record receiving anomalies, component defects confirmed in manufacturing, and verified field failures in separate columns.

SiTime's quality pages distinguish lot release sampling, outgoing quality, and reliability reports. Use the agreed local metric when scoring the supplier. A manufacturer's public quality claim applies to its stated scope. FIT calculations use device-hours. A piece-based DPPM metric needs a stage, quantity, and product population. Pooling unlike figures makes the resulting score impossible to reproduce.

Count the right population for each stage

For incoming samples, report how many pieces were inspected and how many failed separately from the full accepted or rejected quantity. Two defects may trigger rejection of a lot. Dividing those two by the full lot would assume that every uninspected piece was good. A receiving lot-rejection rate uses rejected delivery lots divided by evaluated lots. A full sort with known passes and rejects can support a piece-level result for the batch. Keep all three records with their inspection references if the project needs them.

For manufacturing, record how many devices were mounted at the relevant reference designator during the same interval. Separate suspected component faults from solder, layout, configuration, and test-equipment issues. Deduplicate by event and physical part. One oscillator that fails three startups is one suspect. If a board has two timing parts and neither is confirmed failed, log a board failure first. If a failure follows the removed part, retain the actual method and distinguish confirmed supplier causes from open analysis.

For service, define a shipment cohort. An older deployed project and a newly introduced one have different time in service and reporting opportunities. Record the shipment window, end-user configuration, and time in use. If the installed count is uncertain, state the agreed denominator and limited scope. Separate spares sent with equipment from installed parts to avoid counting them twice.

Worked example with three reported incidents

Assume 100,000 devices were received in a month and all 500 incoming samples passed. Placement consumed 20,000 traceably associated devices. Three failed boards each contain one oscillator. The manufacturer confirms two part failures and one broken pad. The agreed process metric is 2 ÷ 20,000 × 1,000,000 = 100 DPPM. Dividing the three initial reports by 100,000 gives 30, but includes the broken pad and treats 80,000 unused components as if they passed the same process check. Keep the three incidents in the initial report and the 500 zero-defect observations in receiving, with the sampling method.

Suppose service also confirms one bad device that month. Its serial traces to 30,000 units shipped the previous quarter, one oscillator per device. At the specified cutoff, that shipment cohort has 1 ÷ 30,000 × 1,000,000, or about 33.3 DPPM. Later returns may change it. Record the cohort, date window, and cutoff. Do not add it to this month's 20,000 placements. If a piece was already rejected in the factory, check any purported duplicate shipment case against repair or replacement records.

Define how the report is restated. If a pending part from last quarter is confirmed now, revise the historical shipment or production cohort as agreed and mark the revision date. The operations section can count this month's complaints separately. Use overlap indicators when splitting by supplier, customer, or product. A recall spanning customer groups should not inflate the total. For a process change, consider separate before and after trends, retaining each observation quantity and defect class and identifying unresolved lots.

Keep the original rows behind the monthly score

Only aggregate rows that actually share a product scope and criterion. Record the fault, stage, observed quantity, lot, use or shipment window, confirmation, cutoff, and supporting document. A mixed-material event affecting one reel should use that reel's actual distribution. Unrelated lots should not dilute it. Before reviewing a supplier, independently reconstruct one work order's rate from receiving and placement records and compare definitions. If a denominator is still unavailable, preserve the confirmed count and scope and report the rate as pending.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.