A 2,000-piece delivery arrives with a certificate and the correct part numbers, lots, and quantities. Purchasing asks whether it confirms the frequency of this lot. Start with the certificate's actual statement. A certificate of conformity generally declares compliance with agreed documents and delivery conditions. If acceptance also calls for frequency distributions, impedance limits, or readings, request test data that trace to the lot. Decide during sourcing which items need data with every delivery and which need it only for a first shipment or exception.
SiTime publishes product reliability reports, material compliance information, and production lot sampling as separate evidence. Qualification relates to a defined family or process. Lot records show current delivery evidence, while the verified equipment and method allow interpretation. Check that an attached qualification report covers the production lot at issue. When a supplier gives a lot summary, determine whether it came from sampling or an every-piece screen.
Define the report by the decision it supports
The question might be whether one lot fits the frequency window or whether the center of the room-temperature distribution moved across several receipts. The first can use sample size, minimum, maximum, configuration, and disposition. The second can require the mean or individual readings, with consistent conditions and references. For passive crystals, record load and drive level. For active oscillators, capture supply, load, and temperature. A simple "frequency passed" can satisfy an agreement without supplying the data needed to reconstruct a distribution.
Link the shipment lots to the production lots sampled. A distributor may ship two manufacturing lots together and attach a generic manufacturer report. Request a mapping from the reel labels, using manufacturer lots, report IDs, or packing records. One manufacturing lot shipped in installments may share a report if each shipment identifies that lot and the report scope. An aggregate report can protect process details while still showing sample counts, method, and lot. If the labels disagree, preserve the originals and request a correction before sign-off.
Worked example comparing centers of two lots
Suppose a passive crystal has an initial room-temperature tolerance of ±20 ppm. A shipment contains 1,200 from lot A and 800 from lot B. The supplier agreed to provide a 40-piece minimum, maximum, and mean for each lot under common conditions. Suppose A runs from −8 to +6 ppm with a mean of −1 ppm, and B runs from +7 to +15 ppm with a mean of +11 ppm. Both fit the specified window. Their centers differ by 12 ppm. The engineering frequency budget and prior trend determine whether to investigate. A shift alone does not justify rejecting B or pooling both means to hide it.
If B used a different load, the measurement method itself may account for some of the shift. Ask the supplier to check the conditions and repeat on retained units under the same method. After comparability is established, check possible process, fixture, or recipe changes. If B has no actual data, follow the agreement for replacement documentation or complete authorized internal checks and request a concession review. Keep internal results identified as internal evidence.
Before using lot reports for supplier improvement, see whether they include unscreened measurements. Statistics from screened output can omit rejects. Internal process data can include units that never shipped. Agree on the definition and window if the objective is process capability. Preserve revision history and mark the reel and segment sampled. When reports disagree, compare reproducible specimens and methods and use the agreed receipt standard.
Match the paperwork burden to the risk
A stable, lower-risk item may need a certificate and normal incoming checks. A first lot, new source, manufacturing change, or previous variation can warrant temporary lot reports. Agree on an exit criterion, such as consistent methods and stable results across a defined number of lots followed by approval. For cold testing or aging, check which points the manufacturer samples and which it controls through qualification or process controls. A full qualification test on every reel can consume stock without answering the actual lot question.
At sign-off, receiving can check code, quantity, and lot. Quality checks the current report and criteria. Engineering reviews an observed trend where it could consume system margin. Specify during the RFQ when certificates and data are due and what to do if a record is absent. Then check one routine report and one replacement document against the physical lot. The receiving record will show clearly what was verified and which question remains open.