An automotive oscillator passes selection. The supplier sends ten units and a brief marked "PPAP available." The Production Part Approval Process asks whether the submitted material represents what will be produced and delivered for this project. Samples can establish board-level function. PPAP also connects the intended production part revision, process, site, and customer requirements. Differences between the samples and the planned delivery can change the scope and duration of an approval.
AIAG's PPAP manual explains that the process focuses on consistently meeting design records and specifications under actual production conditions and rates. SiTime's automotive oscillator brief lists PPAP availability and AEC-Q100 qualification separately. Availability indicates that the supplier can provide approval documentation for the project. Qualification describes the device. Determine the actual submission and authorized customer approver. Purchasing should mark a quotation offering PPAP as available to request.
Align sample identity with the submission
In the RFQ, provide the complete manufacturer part number, customer drawing and revision, project, expected production site, and required submission items. The customer decides which materials must be specific to the part, which can be shared across a family, and which can be reviewed on site. If a distributor coordinates the request, identify the manufacturer document issuer, distributor contact, and source of production site confirmation. When only the public datasheet is available, ask for a written schedule for the remaining materials.
Keep reel labels and lot numbers on submitted samples, and tie that identity to engineering tests, dimensions, and reports. A prior trial can be retained even if it came from an engineering line, distributor programming, or temporary materials. Create a separate record for the planned production material and the manufacturer's statement of the process and approval coverage. Hold samples with unapproved options in engineering stock. If a document ID differs from the physical marking, have the supplier establish the mapping before sign-off.
Worked example with an engineering pilot and a production pilot
Assume a vehicle module maker orders fifty 25 MHz units. The supplier says the distributor programmed blank devices. Engineering builds thirty boards and passes room-temperature and high-temperature startup checks. The planned production order is 10,000 devices, programmed in the manufacturer's standard process and submitted for customer review. Record the first fifty as engineering samples, including programming source, labels, and test references. Request pilot material from the actual production process and an explanation of where production takes place. Quality and the customer determine the repeat tests. Keep the twenty remaining engineering samples as references within customer-approved uses.
Suppose the required records and an approval form arrive, but the assembly plant listed differs from the one in the quotation. Ask whether the names refer to one plant, a recognized equivalent site, or a transferred process. If evidence confirms one site, update the mapping. If a new plant is involved, submit the additional documentation and representative samples required by the customer. Seek a limited approval from the designated person if allowed and needed. Similar performance from fifty trial parts does not establish coverage for a different plant.
Keep the status of samples and paperwork together in the production schedule. If paperwork is complete but samples have not shipped, show which testing is waiting. If the parts are on site but customer approval is pending, reserve engineering access and block production issue, including at the contractor. If two automotive projects share the first shipment, check each customer's requirements and vehicle conditions. After the first production build, retain the reel identity and a readable label or tape section with the approval records. A complaint investigation can then trace from a board lot to the applicable supplier approval. The signature on an approval package should resolve to the matching revision and production data.
Turn the approval into a standing release condition
Link customer part number, complete manufacturer code, drawing revision, plant or process, customer status, and restrictions to the item master. Show production approval, interim approval, and resubmission status at both receiving and issue. Give interim approval a quantity, work-order scope, or expiration date, with a stop control when it is reached.
If the customer retains only some documents, store the report number, supplier coverage, and owner who can retrieve the rest. Typical reasons to revisit approval include a site change, critical material update, construction change, or revised project requirement. Assess each notice against the previous approval and follow customer rules on resubmission. During handover, trace one production order back to the approved part, plant, recent samples, and signed documents. If some approval is still pending, release only material within the explicit approved scope.