A crystal fails its first start after storage. What should you save before return testing?

A spare instrument spends one week in a storeroom. On its first power-up the firmware times out waiting for the external crystal. A reset gets it running, and a frequency counter shows the expected clock. By the time the unit reaches a service bench, several more starts have passed. Ask the field team to hold the next unit in its received power state and record its serial number. Arrange its first start at a bench that can capture supply, reset and clock-source evidence.

Which part of this pattern could come from the crystal?

ECS describes a form of drive-level dependency, or DLD, in which some quartz crystals show increased series resistance at low drive following inactivity. The resistance may fall again after excitation. The oscillator has to supply enough energy to build an oscillation from a small signal. On a board with limited starting margin, the extra loss can lengthen that first start until it misses a firmware deadline. A successful second start gives a reason to investigate this possibility. Identifying the cause in the resonator requires component measurements, and a recovered clock alone says little about the condition inside the package.

A similar symptom can come from the power supply ramp, reset sequencing, clock fallback logic or leakage around the PCB oscillator pins. The main rail may have been disconnected while a backup battery kept the crystal running. Firmware may also route an internal clock to an output once the external one times out. Check which oscillator was enabled during storage and which one drove the output during the failed start. ECS technical note on drive-level dependency

Reserve a first-start sample before swapping parts

Use boards of the same hardware and firmware revision for a long-storage group and a short-off comparison group. Record the crystal lot for each board and, where possible, distribute lots across the groups. Describe how the units were stored, including time, temperature, humidity, main supply state and whether a battery remained fitted. Match the startup supply and test temperature across the groups. If the field exposure includes a cold start, use a separate comparison to see whether low temperature, time without oscillation, or their combination changes the result.

Before applying power, connect the scope to the relevant rail, reset and a buffered clock output with a known source. Arm a single acquisition. Preserve the oscillator-ready flag and clock-source status if the design exposes them. An instrumented GPIO can mark clock ready and fallback as long as the report identifies what the firmware toggles and when. Capture long enough to see whether the external clock arrives after the deadline or remains absent throughout the acquisition. A probe on the crystal pin itself can add load, so gather the first evidence at buffered points where practicable. Compare a second start under a documented power-off interval and reset method. If the technician starts the timer at the power button, a slow supply ramp can consume much of the measured interval. Keep the raw captures and extract the delay from the same supply-valid criterion for both groups.

Keep the original board and crystal together until the first capture is saved. Repeated excitation, removing the crystal or reheating the assembly can change the state under investigation. Use separate samples for board and crystal swaps whenever possible. Keep the sample identifiers and part lot with every waveform, including the waveforms from units that started on time.

What a small experiment can establish

Consider a hypothetical instrument that requires the external clock to be confirmed within 800 ms after its supply enters the valid region. One group of 12 boards spends 168 hours disconnected from main and backup power. A comparison group of 12 is powered off for 10 minutes under a condition verified to stop oscillation. Both groups receive the same ramp and are tested at the same temperature.

ObservationIllustrative resultFollow-up
First start after storage3 of 12 exceed the 800 ms limit, or 25%Check the three captures for rail, reset, clock source and a late-ready signal
Short-interval restart of those threeExternal clock ready at 85, 102 and 120 msCompare the first and second capture for each board
First start after short power-offAll 12 confirm the external clock within 800 msCheck lot balance and repeat under other required conditions using independent boards

The 25% describes this group of samples. Each restart is paired with a previous first-start result from the same board. Repeated starts on that board do not increase the count of independent boards. If boards are independent and representative and the failure probability is fixed under the test conditions, then a zero-failure result on 12 boards has a one-sided 95% upper bound of about 22.1%. Calculate it as one minus 0.05 raised to the power of 1/12. With 29 independent boards and zero failures, the upper bound under the same model is about 9.8%. A pilot can identify an obvious difference and leave considerable uncertainty about the failure rate. If the two groups came from different crystal lots, balance the lots before generalizing the result.

Preserve the first low-drive resistance result

Ask the crystal manufacturer to reserve unexcited units, apply the agreed storage condition and log resistance at the first low-drive measurement. The report should name the resistance definition, frequency, load condition, fixture, temperature, drive value and dwell time at each step. Some measurements are made at series resonance. Others describe loss at a specified load resonance. Ask the lab to identify any stronger sweep or preconditioning step before the first recorded value. If enough samples are available, one set can follow the agreed sequence of drive changes while a second set stays at low drive, with readings taken at matched times. That comparison helps show whether the changes track excitation or elapsed time. Preserve the whole sequence for each unit.

Engineering can check how much resonator loss the intended oscillator circuit can tolerate. In a simplified hypothetical comparison, suppose the circuit has a measured startup negative-resistance magnitude of 300 Ω. Use 72 Ω and 180 Ω as two estimates of the resonator loss at comparable load conditions, one after stabilization and one measured on a stored unit at low drive. The simple ratios are 4.17 and 1.67. The change shows how increased loss narrows the margin. To assess the actual design, apply the oscillator IC maker's measurement convention and margin criteria and then check the product's timing at the required conditions. The arithmetic alone gives no startup time. ST AN2867, startup time and oscillator safety factor

Use the findings to assign the next check

If untouched supplier samples show elevated low-drive resistance after storage and then recover under documented conditions, give the supplier the affected lots and request a controlled comparison across lots. If the timing instead follows a board revision or supply ramp and the crystal measurements do not follow the fault, have engineering investigate that condition first. Review the crystal's drive rating and recheck stable operation if the oscillator setting is changed. For procurement and service, file the storage and power states, sample composition, first-start deadline and clock-source evidence with the approved configuration. Keep the storage-start requirement alongside ordinary outgoing inspection if the actual use case includes long periods without power.

For a low-power RTC, the MERLIN note on incoming crystal measurements and board drive for the MC-146 shows how to document fixture excitation and the drive delivered in the product.

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.