Specialist Supplier of Crystals & Frequency Control Componentssales@mecxtal.com.cn0755-26500570
MERLIN home / Rednote / Brands and Sourcing

Can a new assembly plant immerse a board that contains both a crystal and an OCXO?

A board that used to be spray-cleaned moves to an assembly plant proposing ultrasonic cleaning. The process engineer needs to identify which timing components can contact liquid, what cleaning restrictions apply, and which route can be validated. Quartz crystals operate by mechanical vibration. NDK warns that ultrasonic cleaning can excite a resonance in the quartz blank or other piezoelectric material and degrade performance. Its oscillator guide also rules out immersion for certain models and all its oven-controlled crystal oscillators. Put a manufacturer prohibition into the actual router and seek manufacturer confirmation for conditional or undefined cases.

A board can contain passive crystals and complete oscillators. Before applying a crystal handling bulletin, identify the part at each designator. Epson covers device types and assembly conditions in its precautions, and NDK has separate guidance for crystals and oscillators. Record the designator, code, type, package, and applicable document revision. Passing an electrical check is one step. Check the customer's restrictions on cleaning process changes as well. The new plant's history with other boards does not establish permission for this board.

Evaluate the recipe by device

Have the process team compare the existing and proposed method, solution, loading, temperature, duration, and drying. For ultrasonic cleaning, capture frequency, power setting, rack position, and load size. Local acoustic fields and stress can vary within the tank. The nameplate frequency and rated power do not describe every position. Include clamping near the timing component, adjacent heavy parts, and production loads larger than the trial.

When immersion is prohibited, investigate a compatible route such as an approved local clean or a qualified flux and process change. Identify restricted designators and rework steps in the work instructions. For a route the manufacturer allows under defined conditions, build witness boards to verify the whole sequence. One group can use the approved route and the other the proposed clean-before-install route. Match component lots and board revisions. Record sequence and thermal history, including when parts already mounted before cleaning are reheated. Investigate possible residues or secondary heat exposure at the relevant station, and evaluate joints, electrical performance, and later operating conditions as required.

Worked example with two timing devices

Suppose Y1 is a passive crystal the supplier permits testing under the proposed conditions. X1 is an NDK OCXO whose instructions prohibit immersion. If both are installed before cleaning, take whole-board immersion out of the route. The assembly team proposes mounting X1 after cleaning. Check whether that adds heat exposure for Y1 and how residues from X1 soldering will be handled. The existing cleaning route or another manufacturer-confirmed route may also be feasible. Check the equipment and define the operation order on the traveler.

Suppose each of two permitted routes uses eight witness boards. For the delayed X1 group, inspect the empty footprint after cleaning and photograph the boards before X1 enters the process. Measure the profile during X1 installation and see whether Y1 receives another complete reflow. Assume the original route used two passes, and the first X1 proposal adds a full third pass. If Y1 allows only two, send the proposal back and investigate an approved localized method or retain the original route. Eight functional passes cannot replace documented process compliance.

Link board IDs, device lots, and recipes. Distribute witness boards from similar panel positions randomly so boards from a single reflow lane cannot dominate the trial group. Preserve failed parts for manufacturer comparison without subjecting them to another clean. Keep an unexplained failed method out of repair procedures. After final sign-off, release the applicable work orders against the actual approved revision.

Site transfer can also affect boards shipped half-assembled. If an old line installed a component that cannot be immersed, the new line needs an alternate route at receiving. Verify board identification before and after the tank using actual tooling. Similar-looking populated and unpopulated boards on one tray need obvious status labels. For the first shipment, request the installation sequence and equipment program record. Compare a work order to the approved route, so a future machine failure and temporary line change have the same check.

Specify the limits in the change record

Record the approved board and component revisions, cleaner and recipe, maximum load, acceptance criteria, and any designators excluded from the tank. Review a solvent, duration, carrier, or plant change against those limits. A failure analysis should be able to trace a board serial to the actual recipe and time, giving the supplier a real processing history. The practical outcome of the transfer is a route the assembly operator can follow.

References

WeChat

MERLIN · TIMING COMPONENTS

Scan with WeChat to contact Sales

Add our WeCom contacts from your usual WeChat app.

On desktop, scan with your phone. On mobile, save the QR image and select it from your album in WeChat Scan.