Selection reference · illustrative scenario
Clock roles in the application
Identify acquisition, digital-processing, image-transport and timestamp references separately, then define any common-source or synchronization requirement.
Engineering selection review
Evaluate signaling, phase noise, jitter bands and start-up with the receivers and distribution network. Image performance is a system property, not a source-only guarantee.
Procurement and documentation
Include acquisition and processing architecture and signaling and noise/jitter conditions, plus the existing full code, sample and production quantities and delivery target. Discuss nominated international brands and domestic candidates separately, confirming parameters and documents by part.
Illustrative validation scenario
Validate candidates in representative acquisition and transport modes using consistent measurement connections, retaining data, supply and temperature records.
Inquiry & validation checklist
- Acquisition and processing architecture
- Signaling and noise/jitter conditions
- Distribution and synchronization
- Project documents and board validation
